Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> 87, 91 secondary piping failed, cracks found at bravo hubs at Dispensers 5/6 and 7/8. <br /> Diesel secondary piping failed due to torn test boot. Replaced test boot, retested and passed. <br /> Diesel STP sump failed due to torn test boot. Replaced test boot, retested and passed. <br /> UDC 5/6, 7/8 failed due to cracked conduit penetrations. <br /> No inspector present. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />