My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 9:42:05 AM
Creation date
1/10/2023 9:05:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC. #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> B. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by L Manufacturer ® Industry Standard Ll Professional Engineer <br /> Test Type Ll Pressure R3 Vacuum LJ Hydrostatic <br /> Test Equipment Used: gauge <br /> Tank ID T1: Regular(RUL) T2: Premium(PUL) T3: Diesel(Diesel) <br /> Tank Manufacturer Xerxes Xerxes Xerxes <br /> Tank Capacity 10000 10000 11000 <br /> Test Stark Time 9:09 9:09 9:09 <br /> Initial Reading 10hg 10hg 10hg <br /> Test End Time 10:09 10:09 10:09 <br /> Final Reading 10hg 10hg 10hg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results A Pass Li Fail 1 0 Pass Ll Fail I R) Pass Ll Fail Ll Pass D Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by El Manufacturer L) Industry Standard Ll Professional Engineer <br /> Test Type El Pressure El Vacuum El Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Stark Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> PasslFail Criteria <br /> Tightness Test Results Ll Pass Ll Fail Ll Pass J Fail U Pass Ll Fail D Pass U Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Li Pass L Fail LJ Pass Ll Fail Ll Pass L Fail Li Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked '`Fail" and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.