My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 9:42:05 AM
Creation date
1/10/2023 9:05:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC. #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> B. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by L Manufacturer Ll Industry Standard Ll Professional Engineer <br /> Test Type Ll Pressure LJ Vacuum LJ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Stark Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Ll Pass Li Fail Ll Pass Ll Fail Ll Pass Ll Fail Ll Pass D Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by LJ Manufacturer 0 Industry Standard Ll Professional Engineer <br /> Test Type ® Pressure El Vacuum El Hydrostatic <br /> Test Equipment Used: gauge <br /> Pi a Ru n ID TT1:Regular L1(RUL)STP T-1-2:Premium L1(PUL)STP TT3:Diesel L1(Diesel)STP <br /> p Containment 1 to Containment 1 to Containment 1 to 5/6,7/8 <br /> Pipe Manufacturer ameron ameronameron <br /> Test Stark Time 9:14 9:14 9:14 <br /> Initial Reading 5psi 5psi 5psi <br /> Test End Time 10:14 10:14 10:14 <br /> Final Reading 5psi 5psi 5psi <br /> Change in Reading 0 0 0 <br /> PasslFail Criteria 0 0 0 <br /> Tightness Test Results 0 Pass Ll Fail 0 Pass J Fail 0 Pass Ll Fail D Pass U Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Li Pass L Fail LJ Pass Ll Fail Ll Pass L Fail Li Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked '`Fail" and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.