Laserfiche WebLink
I. Minimum Requirements for Food Facility Plans <br />Plans shall be drawn to scale. The recommended scale is % inch = 1 foot and shall include the following: <br />A. Name and address of the food facility; the name, mailing address and telephone number of owner, contractor, <br />and contact person. <br />IN B. Vicinity Map <br />tg C. Floor plan of entire facility. <br />® p Floor plan showing equipment layout including: (see appendix A) <br />® 1. Complete equipment checklist, including the methods of installation. (see Appendix a) <br />IN 2. Equipment manufacturer specification sheets and/or elevations. <br />IN E. Plumbing layout. <br />16 F. Electrical layout. <br />L G. Exhaust hood ventilation and make-up air systems. Complete the attached worksheet for each hood. <br />(See Appendix C) <br />l H. A site plan including proposed waste storage receptacle location. <br />CK I. Room finish schedule for floors, base, walls, and ceiling that indicates the type of material; the color and the <br />surface finish for each room or area. Give specific brand names. Samples or specifications of proposed finish <br />materials may be required. (see Appendix D) <br />II. Field Construction Inspection Procedure <br />M A. Preliminary Construction Inspection: <br />Preliminary construction inspection prior to installation of equipment is available upon request. Contact this <br />department to request preliminary construction inspection. Our current hourly rate will be charged for this <br />inspection. <br />IN B. Final Construction Inspection: <br />Upon completion of construction, including finishing work, contact the Environmental Health Department to <br />arrange for a final construction inspection. Approved materials and good workmanship are significant factors in <br />the evaluation and final field approval of food facility construction and equipment installation. Final construction <br />must be approved by this agency prior to opening for business or use of remodeled areas. <br />III. Structural Requirements: <br />The plans must show and specify in detail the following: <br />A. Floors: <br />® 1. CRFC 114268 <br />(a) Except in sales areas and as otherwise specified in subdivision (d), the floor surfaces in all areas in which <br />food is prepared, prepackaged, or stored, where any utensil is washed, where refuse or garbage is stored, <br />where janitorial facilities are located in all toilet and handwashing areas, except with respectto areas relating <br />to guestroom accommodations and the private accommodations of owners and operators in restricted food <br />service facilities, and in employee change and storage areas shall be smooth and of durable construction <br />and nonabsorbent material that is easily cleanable. <br />(b) Floor surfaces shall be coved at the juncture of the floor and wall with a 318 inch minimum radius caving and <br />shall extend up the wail at least 4 inches, except in areas where food is stored only in unopened bottles, <br />cans, cartons, sacks, or other original shipping containers. <br />(c) Public or private schools constructed or remodeled after the effective date of this part shall comply with <br />subdivision (b). Public and private schools constructed before the effective date of this part need not comply <br />with subdivision (b), provided that the existing floor surfaces are maintained in good repair and in a sanitary <br />condition. (Vinyl or rubber top set base is not acceptable.) <br />EHD 16-01 6 PLAN CHECK GUIDE <br />811/14 <br />