Laserfiche WebLink
REVISIONS <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA By <br /> Indoor Lighting Indoor Lighting 7 <br /> NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E zi� <br /> This document is use to demonstrate compliance with requirements1§ 10.9, §110.12(c), §130.0, §130.1, §140.6 and§141.0(b)2 for indoor lighting scopes using the Project Name: Ramen 101 Restaurant IReport Page: Page 2 of 8 <br /> prescriptive path. Project Address: 2162 Daniels St Manteca Ca 95337 Date Prepared: Mar 26 , 202 <br /> Project Name: Ramen 101 Restaurant Report Page: Page 1 of 8 <br /> Project Address: 2162 Daniels St Manteca Ca 95337 Date Prepared: Mar 26 , 2024C. COMPLIANCE RESULTS <br /> Table Instructions:If any cell on this table says'DOES NOT COMPLIES"or"COMPLIES with Exceptional Conditions"refer to table D. for guidance. <br /> A. GENERAL INFORMATION Allowed lighting Power per14§ 0.6(b) (Watts) Adjusted lighting Power per§140.6 a (Watts) Compliance Result <br /> 01 Project Location(city) Manteca 04 Total Conditioned Floor Area(ft2) 956 Lighting in 01 02 03 04 05 06 07 08 09 <br /> 02 Climate Zone 12 05 Total Unconditioned Floor Area(ft2) 0 Conditioned and Adjustments <br /> 03 Occupancy Types Within Project(select all that apply): 06 #of Stories(Habitable Above Grade) 1 unconditioned Complete Area Catego Tailored > Total Adjusted <br /> Lighting � <br /> spaces must not Area Catego Additional - Control Credit = (Watts) <br /> ❑ Office ❑ Retail ❑ Warehouse ❑ Hotel/Motel ❑ Schools ❑ Support Areas Building §140.6(c)3 = Total Allowed 05 must be >=08 <br /> be combined for §140.6(c)2 §140.6(c)2GIncludes <br /> Parkin Garage High-Rise Residential Relocatable Healthcare Other Write in See Table I compliance per §140.6(c)1 - + (+) (Watts) §140.6(a)2 Adjustments §140.6 <br /> 140.6(b)1 <br /> B. PROJECT SCOPE (See Table 1) (See Table 1) (See Table J) (See Table K) (See Table F) (See Table P) <br /> Table Instructions:Include any lighting systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined n Conditioned 640 0 = 640 >_ 318 0 = 318 COMPLIES <br /> 140.6 or 141.0 b 2 for alterations. WARNING: Changing the Calculation Method in the table will result in the deletion of date previously input. If you need to change the Unconditioned = >_ _ <br /> calculation method.please open new form or use "Save As". Controls Compliance (See Table H for Details) COMPLIES <br /> Scope of Work Conditioned Spaces Unconditioned Spaces Rated Power Reduction Compliance (See Table Q for Details) Not Applicable <br /> 01 02 03 04 05 <br /> My Project Consists of(check all that apply): Calculation Method Area(ft2) Calculation Method Area (ft2) D. EXCEPTIONAL CONDITIONS <br /> ❑ New Lighting System This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form. <br /> co <br /> No exceptional conditions apply to this project. co <br /> ❑ Altered Lighting System Area Category Method 956 0 <br /> rn <br /> Q <br /> Total Area of Work(ft2 956 0 E.ADDITIONAL REMARKS U <br /> his table includes remarks made by the permit applicant to the Authority Having Jurisdiction. z p <br /> :�i U <br /> F. INDOOR LIGHTING FIXTURE SCHEDULE O <br /> w O <br /> LL�This table includes all permanent designed lighting and all portable lighting in offices. Q <br /> m >- <br /> Designed Wattage: Conditioned Spaces r co <br /> 01 02 03 04 05 06 07 08 09 10 LU UJ N <br /> Small LO <br /> Name or Item Complete Luminaire Modular Aperture & Watts per How is Wattage Total Number Excluded per Design Watts Field Inspector ('� co0 <br /> o U) <br /> Tag Description (Track) Fixture Color Change' luminaire 2 determined of Luminaires §140.6(a)3 Pass Fail LU U) w " w <br /> � Lu <br /> A A No No 7 Mfr.Spec 18 No 126 ❑ ❑ > u) Oz <br /> B B No No 16 Mfr.Spec 6 No 96 L] El > � Q <br /> _ <br /> J <br /> < w <br /> U) LU <br /> 0 <br /> LU <br /> N <br /> 07 <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance January 2020 ``' <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Indoor Lighting Indoor Lighting <br /> NRCC-LTI-E(Created 01/20) <br /> CALIFORNIA ENERGY COMMISSION NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E <br /> Project Name: Ramen 101 Restaurant Report Page. Page 3 of 8 Project Name: Ramen 101 Restaurant Report Page: Page 4 of 8 <br /> Project Address: 2162 Daniels St Manteca Ca 95337 Date Prepared: Mar 26 , 2024Project Address: 2162 Daniels St Manteca Ca 95337 Date Prepared: Mar 26 , 2024Z co <br /> Q LO <br /> F. INDOOR LIGHTING FIXTURE SCHEDULE H. INDOOR LIGHTING CONTROLS (Not Including PAFs) � <br /> C 2X4 No No 16 Mfr.Spec 6 No 96 ❑ ❑ This table includes lighting controls for conditioned and unconditioned spaces. When a control having a *is shown, the notes section of this table provides more detail on how = U <br /> ❑ ❑ compliance is achieved. The lighting controls section of the Compliance Summary Table on the first page will show'DOES NOT COMPLY"if the notes are left blank. Q <br /> ❑ ❑ Building Level Controls W <br /> ❑ ❑ 01 02 03 (n Z <br /> 11 ElMandatory Demand Response§110.12(c) Field Inspector LUQ <br /> 11 ElPass Fail <br /> Total: Designed Wattage: Conditioned Spaces 318 Not Required<= 10,000 SF Not Required<= 10,000 SF ❑ ❑ r U j <br /> Area Level Controls W O U) <br /> J r J <br /> 04 05 06 07 08 09 10 11 12 H Z LU <br /> LU <br /> Complete Building or Area Area Controls Multi-Level Shut-Off Controls Primary/Sky Secondary InterlockedW Q <br /> FOOTNOTE:Design Watts for small aperture and color changing luminaires which qualify per§140.6(a)4B is adjusted to be 75%of their rated wattage. Table F automatically makes Area Description Category Primary Function 130.1 a Controls §130.1(c) lit Daylighting Systems Field Inspector U C0 <br /> this adjustment, the permit applicant should enter full rated wattage in column 05. Area 130.1 b Daylighting 14§ 0.6(d) 140.6 a 1 LU c � <br /> ?Authority Having Jurisdiction may ask for luminaire cut sheets to confirm warrage used for compliance per 130.0 c wattage used must be the maximum rated for the luminaire, not §130.1(d) O Q T <br /> the lamp. Pass Fail ISL N <br /> d <br /> G. MODULAR LIGHTING SYSTEMS Kitchen All Other Space Types Manual ON/OFF Dimmer Occupancy Senso Included Included No ❑ ❑ <br /> This table calculates wattage for modular lighting systems/track lighting fixtures indicated on Table F and transfers wattage to Table F. <br /> Manual <br /> 01 02 03 04 Dining All Other Space Types ON/OFF Dimmer Occupancy Sensor Included Included No ❑ ❑ <br /> Name or Completed Track Description Calculation Method per 130.0(c)6 Track Manual CEILING LIGHTING <br /> Item TagWattage Restrooms All Other Space Types ON/OFF Dimmer Occupancy SensorIncluded Included No ❑ ❑ COMPLIANCE <br /> ii Current Limiter dri <br /> i Installed Luminaires iii Overcurrent Protection ri Power supplied by REPORT <br /> LED track ❑ vs Default 30 W/ft ❑ ❑ Panel ❑ ver, power supply or ❑ ❑ <br /> transformer <br /> VA Current Limiter0 ❑ ❑ �pQROEA°oyF`��� <br /> LED track i Installed Luminaires iii Overcurrent Protection iv Power supplied by ❑ ❑ <br /> ❑ ❑ ii Current Limiter ❑ ❑ driver, power supply or No. <br /> vs Default 30 W/ft Panel transformer * * 13 6-30-23 <br /> NOTE:Controls with a require a note in the space below explaining how compliance is achieved. <br /> VA Current Limiter EX.Conference 1:Primary/Skylight Daylighting:Exempt because less than 120 watts of general lighting,EXCEPTION 1JT C I y IL <br /> 0 to§130.1(d)2 Plan Sheet Showing Daylit Zones: qTF OF CA��F�� <br /> FOOTNOTE:For power-over-Ethernet lighting systems, power provided to installed non-lighting devices may be subtracted from the total power rating of the power-over-Etherent <br /> system. <br /> Designed by : T.W <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance January 2020 <br /> Date : Mar 26, 2022 <br /> scale : AS SHOWN <br /> Drawn : W.P.D. <br /> Job : <br /> SHEET <br /> T =24 <br /> OF SHEETS <br />