Laserfiche WebLink
REVISIONS <br /> By <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Indoor Lighting Indoor Lighting zi� <br /> NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E <br /> Project Name: Ramen 101 Restaurant IReport Page: Page 5 of 8 Project Name: Ramen 101 Restaurant Report Page: Page 6 of 8 <br /> Project Address: 2162 Daniels St Manteca Ca 95337 IDate Prepared: Mar 26 , 2024Project Address: 2162 Daniels St Manteca Ca 95337 1 Date Prepared: Mar 26 , 202 <br /> I. LIGHTING POWER ALLOWANCE: COMPLETE BUILDING OR AREA CATEGORY METHODS O.ADDITIONAL LIGHTING ALLOWANCE:TAILORED VERY VALUABLE MERCHANDISE <br /> Each area complying using the complete Building or Area Category Methods per14§ 0.6(b)are included in the table. Column 06 indicates if additional lighting power allowance per This Section Does Not Apply <br /> 140.6(c)or adjustments per§140.6(a)are being used. <br /> Conditioned Spaces P. POWER ADJUSTMENT: LIGHTING CONTROL CREDIT(POWER ADJUSTMENT FACTOR(PAF)) <br /> 01 02 03 04 05 06 This Section Does Not Apply <br /> Area Description Complete Building or Area Category Primary Allowed Density Area (ft2) Allowed Wattage Additional Allowance/Adjustment Q. RATED POWER REDUCTION COMPLIANCE FOR ALTERATIONS <br /> Function Area (W/ft2) (Watts) Area Category PAF This Section Does Not Apply <br /> Kitchen Kitchen Area 0.95 270 257 No No <br /> Dining-seating Dining Area 0.55 583 321 No No R. 80 % LIGHTING POWER FOR ALTERATIONS-CONTROLS EXCEPTIONS <br /> Restrooms Restroom Area 0.6 103 62 No No This Section Does Not Apply <br /> S. DAYLIGHT DESIGN POWER ADJUSTMENT FACTOR(PAF) <br /> This Section Does Not Apply <br /> T. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION 00 <br /> M <br /> Total 956 640 See Table J, or P for detail Table Instructions: Selection have been made based on information provided in previous of this document. If any selection needs to be changed, please explain why in Ln <br /> Table E. Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at https.11ww2.energy.ca.gov/ <br /> J.ADDITIONAL LIGHTING ALLOWANCE: AREA CATEGORY METHOD QUALIFYING LIGHTING SYSTEM title24/2019 standards/2019_compliance_documents/Nonresideential Documents/NRCl/ a <br /> U <br /> This Section Does Not Apply Field Inspector z O <br /> YES NO Form/Title 0 U <br /> K. TAILORED METHOD GENERAL LIGHTING POWER ALLOWANCE Pass Fail Lu o <br /> This Section Does Not Apply 0 O NRCI-LTI-01-E- Must be submitted for all buildings ❑ ❑ LL Q <br /> - m >- <br /> �NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), t be r °o U <br /> L. ADDITIONAL LIGHTING ALLOWANCE: TAILORED WALL DISPLAY O ❑ ❑ w Lu - <br /> recognized for compliance. N <br /> This Section Does Not Apply Z 5 LO <br /> M. ADDITIONAL LIGHTING ALLOWANCE: TAILORED FLOOR FLOOR AND TASK LIGHTING W w o 0 <br /> This Section Does Not Apply L Lu <br /> Z <br /> Luow <br /> N.ADDITIONAL LIGHTING ALLOWANCE: TAILORED ORNAMENTAL/SPECIAL EFFECTS Q Q <br /> This Section Does Not Apply w <br /> 0 <br /> N <br /> 07 <br /> co <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance January 2020 <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Indoor Lighting Indoor Lighting <br /> NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E <br /> Project Name: Ramen 101 Restaurant Report Page: Page 7 of 8 Project Name: Ramen 101 Restaurant Report Page: Page 8 of 8 Z � <br /> Project Address: 2162 Daniels St Manteca Ca 95337 IDate Prepared: Mar 26 , 2022 Project Address: 2162 Daniels St Manteca Ca 95337 IDate Prepared: Mar 26 , 2022 LO <br /> O� <br /> O 9 NRCI-LTI-04-E- Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference ❑ ❑ DOCUMENTATION AUTHOR'S DECLARATION STATEMENT U <br /> room, a multipurpose room, or a theater to be recognized for compliance. I certify that this Certification of Compliance documentation is accurate and complete. Q U <br /> 0 0 NRCI-LTI-05-E- Must be submitted for a power Adjustment Factor(PAF)to be recognized for compliance. 11 El F— LU <br /> Documentation Author Name: TOMMY WOO Documentation Author Signature: � <br /> NRCI-LTI-06-E - Must be submitted for additional wattage install in a video conferencing studio to be recognized U) z <br /> O for compliance. 11ElCompany: TW DESIGNERS Signature Date: Mar 26 , 2022 < <br /> Address: 39210 STATE ST SUITE#119 CEA/HERS Certification Identification (if applicable): <br /> CD CO <br /> U. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE <br /> City/State/Zip:FREMONT CA 94538 Phone: (510)742-1133 LU O U) <br /> Table Instructions: Selection have been made based on information provided in previous of this document. If any selection needs to be changed, please explain why inJ r —J <br /> Table E. Additional Remarks. These documents must be provided to the building inspector during construction and any with'M"in the form name must be completed throu 7h an RESPONSIBLE PERSONS DECLARATION STATEMENT <br /> LU <br /> I certify the following under penalty of perjury, ~ Z Z <br /> Acceptance Test Technician Certification Provider(ATTCP). For more information visit: https://www.energy.ca.gov/title24/attcp/providers/htm/ fy g p y p j ry, under the laws of the State of California: Q <br /> 1.The information provided on this Certificate of Compliance is true and correct. 0 W 0 <br /> Field Inspector 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system designed identified on this Certificate of LU N <br /> YES NO Form/Title Pass Fail Compliance(responsible designer). r.0 <br /> 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this N <br /> 0 0 NRCA-LTI-02-A-Must be submitted for occupancy sensors and automatic time switch controls. ❑ ❑ Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. d <br /> 0 0 NRCA-LTI-03-A-Must be submitted for automatic daylight controls. ❑ ❑ 4.The building design features or system design features identified on this Certification of Compliance are consistent with the information provided on other <br /> ❑ applicable compliance documents,worksheets, calculations, plans, and specifications submitted to the enforcement agency for approval with this building application <br /> 0 NRCA-LTI-04-A-Must be submitted for demand responsive lighting controls. ❑ 5. 1 will ensure that a completed signed copy of this Certification of Compliance shall be made available with the building permit(s) issued for the building, and made available <br /> 0 0 NRCA-LTI-05-A-Must be submitted for institutional tuning power adjustment factor(PAF). ❑ ❑ to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the <br /> 0 0 NRCA-ENV-03-F- Must be submitted for daylighting design power adjustment factor(PAF). ❑ ❑ documentation the builder provides to the building owner at occupancy. Ye CEILING LIGHTING <br /> Responsible Designer's Name: TOMMY WOO Responsible Designer's Signatur COMPLIANCE <br /> REPORT <br /> Company: TW DESIGNERS Date Signed: Mar 26 , 2022 <br /> Address: 39210 STATE ST SUITE#119 License: 445470 OOFESS/O,yq <br /> City/State/Zip: FREMONT CA 94538 Phone: (510)742-1133 �� ��Q yF <br /> No. <br /> 6-30-23 <br /> OF CA F�`��\P <br /> Designed by : T.W <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance January 2020 Date : Mar 26, 2022 <br /> scale : AS SHOWN <br /> Drawn : W.P.D. <br /> Job : <br /> SHEET <br /> T =24m <br /> 1 <br /> F SHEETS <br />