LEGEND & SYMBOLS: COLD WATER LINE SIZING:
<br /> WATER HEATER WORK SHEET:
<br /> 1. SP/WP SOIL/WASTE 8. PREP-SINK PREPARATION SINK REVISIONS
<br /> PIPE LINE 9. G/T GREASE TRAP WATER SUPPLY FIXTURE UNITS (DFU) FIXTURES NO. OF X GPH = GPH By
<br /> GR (RE: CPC 2019 TABLE 610.3)
<br /> 2. VP VENT PIPELINE COMPARTMENT
<br /> 10. W/H w/H WATER HEATER
<br /> 3. FCO O FLOOR CLEAN-OUT FIXTURE QUANTITY X FIXTURE UNIT TOTAL 3-TUB SINK (POT-PAN) 3 25 75 GPH 1
<br /> 11. VTR VENT THRU ROOF (WSFU) (WSFU)
<br /> 4. W/CO C i WALL CLEAN-OUT
<br /> 12. CWL COLD WATER LINE 3-TUB SINK 1 3 3 PREPARATION SINK 1 10 10 TYPICAL FLOOR SINK
<br /> 5. F.S. FLOOR SINK W/DOME STRAINER
<br /> 13. HWL HOT WATER LINE HAND SINK 2 5 10
<br /> 6. F.D. (®; FLOOR DRAIN PREP SINK 1 3 3 2°INDIRECT WASTE -
<br /> FINISH DRAINS AT LEAST
<br /> 7. H.S. HAND SINK
<br /> 14. GPL GAS PIPE LINE MOP SINK 1 3 3 LAVATORY SINK 1 5 5 1"OVER FLOOR SINK TOP
<br /> MOP SINK 1 15 15 G C TO GROUT IN
<br /> GAP BETWEEN
<br /> GENERAL NOTES: HAND SINK 2 2 4 SINK&FLOOR
<br /> A) ALL F/D SHALL HAVE TRAP PRIMER LAVATORY 1 1 1 TOTAL FLOW GPH = 115 GPH °a°4°
<br /> B) ALL WASTE PIPING SHALL DRAIN WITH 4' PER FOOT. WATER CLOSET 1 2.5 2.5 FLUSHED WITH FLOOR
<br /> C) THE PLUMBING CONTRACTOR SHALL VERIFY THE
<br /> ------------------------------------------------------------------------------------------------
<br /> EXISTING MAIN WASTE LINE LOCATION. TOTAL FIXTURE UNITS = 16.5 WSFU COMPUTING THE BTU INPUT:
<br /> NOTE: WATER LINE SIZE NEEDED: 1 INCH TOTAL SINK GPH 115 X 0.60 = 69 GPH
<br /> ALL PIPE INSULATION SHALL COMPLY WITH TABLE 4-22, FOR AREAS FOR FLOOR SINK
<br /> 2019 NONRESIDENTIAL COMPLIANCE MANUAL NOTE: THE GENERAL CONTRACTOR SHALL VERIFY THAT COLD TOTAL FLOW RATE = 69 x 660 = 45,540 BTU MIN IS FULLY ACCESSIBLE
<br /> WATER SUPPLY LINE SHALL HAVE BACK FLOW PREVENTION
<br /> DEVICE OR INSTALL A NEW ONE PER PLUMBING CODE. FLOOR SINK DETAIL co
<br /> PLUMBING NOTES: (PER CPC TABLE 6-5) LO
<br /> M
<br /> WASTE LINE & VENT LINE SIZING:
<br /> 1). PLUMBING CONTRACTOR SHALL EXAMINE ALL EXISTING PLUMBING SYSTEM AND DRAINAGE FIXTURE UNIT (DFU)
<br /> EXISTING LOCATION OF MAIN SEWAGE LINE. THE PLUMBING CONTRACTOR TO BE (RE: CPC 2019 TABLE 702.1) p O
<br /> VERIFY EXACT LOCATION & DEPTH OF POINTS OF CONNECTION TO EXISTING
<br /> UTILITIES. � O
<br /> 2). PIPING SHOWN ON PLAN IS DIAGRAMMATIC. CONTRACTOR SHALL DETERMINE TABLE 610.4 FIXTURE QUANTITY X FIXTURE UNIT TOTAL 1/2" U) _rn Q
<br /> EXACT LOCATION TO AVOID ANY CONFLICT WITH EXISTING CONDITIONS. FIXTURE UNIT ABLE FOR DETERMINING WATER PIPE AND METER SIZES DFU I0 co V
<br /> 3). PLUMBING COMBINE VENTS TO BE MINIMIZE NUMBER OF ROOF PENETRATION LU
<br /> SIZE PER CODE. VENTS NOT PERMITTED WITHIN 10' OF HVAC AIR INTAKE OR BUILDING CWZ C4 z
<br /> WINDOWS. WHERE POSSIBLE, LOCATED VENTS THROUGH ROOF AT REAR SIDE METER AND SUPPLY MAXIMUM ALLOWABLE LENGTH IN FEET(meters) 3-TUB S/S SINK 1 3 D F U 3 DFU TRAP PRIMER VALVE U)
<br /> STREET AND 40 60 80 100 150 200 250 300 400 500 600 700 800 90( SUPPLY TO FREQUENTLY IN WALL BEHIND ACCESS PANEL
<br /> OF BUILDING. EACH FIXTURES SHALL BE PROPERLY VENTED. ALL VENTS SHALL BE SERVICE, BRANCHES, USED FIXTURE 1 U) w w
<br /> TERMINATED IN ACCORDANCE WITH CPC. INCHES INCHES (1z) (1s> (za> (30) (46> (61) (76) (91) (122> (15z> (183) (213> (244) (27 PREP-SINK 1 3 3 LU o p
<br /> �� Pressure Range-30 to 45 psi(207 to 310 kPA)** NOTE: 0 W
<br /> 4). THE HOT WATER PIPE TOBVE WRAPPED WITH A MINIMUM OF 1 THICK R-7.7 INSULATION. - PROVIDED AND INSTALL 12°x12°ASSESS PANEL U) Z 3:
<br /> STORAGE TYPE WATER HEATERS FOR DOMESTIC WATER HEATING MUST BE Y4 iZ*** 6 s 4 3 2 1 1 1 0 0 0 0 0 o MOP SINK 1 3 " 3 = J
<br /> FOR MAINTENANCE OF TRAP PRIMER.
<br /> WRAPPED WITH AN INSULATION BLANKET HAVING ON R-VALUE OF 16 OR GREATER. %4 4 16 16 14 12 9 6 5 5 4 4 3 2 2 2 Q 11 Q
<br /> 5). PLUMBING FIXTURES SHALL BE MEET ACCESSIBLE CODE OF 2019. %4 1 29 25 23 21 17 15 13 12 10 8 6 6 6 6 HAND SINK 2 1 11 2i
<br /> 2
<br /> ) MAXIMUM OF 8 FLOOR DRAIN W
<br /> 6). FLOOR DRAINS IN TOILETS & IN THE INFREQUENT USED AREAS. THE F/D SHALL BE 1 1 36 31 27 25 20 17 is 13 12 to a 6 6 6 / o
<br /> PROVIDED WITH AN APPROVED TRAP PRIMER. i4 u4 36 33 31 28 24 23 21 19 17 16 13 12 12 11 LAVATORY 2 1 " 2 i M
<br /> 7). FOR ALL FIXTURES THAT GO TO THE FLOOR SINK THE DRAIN PIPE SHALL HAVE A 1" MIN. 1 1%4 54 47 42 38 32 28 25 23 19 17 14 12 12 11 1/2" j FINISHED FLOOR
<br /> AIR GAP FROM THE FLOOR SINK. 1% 1%4 78 68 57 48 38 32 28 25 21 18 15 12 12 11 „
<br /> 8). INSTALL or VERIFY THE EXISTING CONDENSATION LINE FOR THE A/C UNIT ON ROOF 1 1Y2 85 84 79 65 56 48 43 38 32 28 26 22 21 20 WATER CLOSET 1 4 „ 4
<br /> r
<br /> TOP TO HAVE A MIN. OF 3/4" COPPER PIPE WITH A TRAP TO SEWER LINE. 1 z 1 z Iso 124 105 91 70 57 49 45 36 31 26 23 21 zo FLOOR SINK 4 2 11 8
<br /> 9). INSTALL HORIZONTAL DRAINAGE PIPING WITH A SLOPE OF 1/4" PER FOOT. 2 1 z 151 129 129 110 so 64 53 46 38 32 27 23 21 20
<br /> 10). INCOMING WATER PRESSURE IN EXCESS OF 80 PSI SHALL INSTALL AN APPROVED 1 2 ss ss ss ss ss ss 82 so 66 61 s7 s2 a9 46 --------------------------------------------------------------- -------------------------------
<br /> -71
<br /> PRESSURE REGULATOR. TOTAL FIXTURE UNITS 25 DFU /
<br /> GAS CONSUMPTION: NOTE: ALL VENT LINE SIZES ARE: 2" 1/2"COPPER"X"
<br /> INDOOR WATER USE EFFICIENCY WITH CGBSC SECTION 5.303.3, j NOTE: ~ I-
<br /> CONNECT TO FLOOR DRAIN Z M
<br /> A) LAVATORIES SINK- 0.5 GPM @ 60 PSI PROVIDED W/1/2"PRIMER TAP Q M
<br /> TRAP PRIMER VALVE AND DISTRIBUTION UNIT LO
<br /> ITEM APPLIANCES B.T.U. BY PRECISION PLUMBING PRODUCTS INC. 0-)
<br /> FOR DRAIN & VENT LINE CAPACITY OREGON #1 CORROSION RESISTANT BRASS Q
<br /> B) WATER CLOSET- 1.28 GALLONS/FLUSH (RE: CPC 2019 TABLE 703.2) TRAP PRIMER W/A COPPER RESERVOIR AND = 0
<br /> 11 11 1' 1' 1' '1 A PVC DIAPHRAGM. Q U
<br /> C)KITCHEN FAUCETS: SHALL HAVE MAX.FLOW RATE OF NOT MORE THAN 1 DEEP FRYER 2x105,000
<br /> 1.8 GALLONS PER 60 PSI 2 BURNER WOK 240,000 PIPE SIZE INCHES 1-1/4 1-1/2 2 3 4 5 611 LU
<br /> 3 STOCKPOT 90,000 " TRAP PRIMER PIPING DETAIL LU
<br /> D) URINAL-0.125 GALLON/FLUSH 4 GRIDDLE 60,000 (MAX. FLU UNIT)
<br /> VERTICAL 1 22 163 484 256 600 1380 NOT TO SCALE
<br /> 5 RICE COOKER 34,000 ~
<br /> HORIZONTAL 1 1 83 354 2165 4285 7205
<br /> 6 WATER HEATER 80,000 LU O v�
<br /> LU
<br /> PIPE MATERIAL SCHEDULE 7 SPACE HEATER 60,000 (MAX.LENGTH) 45 65 85 212 300 390 750
<br /> VERTICAL (FEET) Z Q
<br /> SERVICE UNDERGROUND ABOVE GROUND HORIZONTAL(UNLIMITED) #4 REBAR @ 24"O.C. DOWEL INTO CONERETE SLAB 0 W 0
<br /> TOTAL BTU = 774,000 BTU W/SIMPSON SET-XP EPDXY(ICC ES ESR 2508) 7" LU CM
<br /> COLD & HOT WATER HARD TEMPER, COLD HARD TEMPER, COLDGAS LINE SIZING: FOR VENT PIPE EMBEDMENT MIN O N
<br /> DRAWN COPPER DRAWN COPPER MAX. UNITS 1 83 24 84 256 600 1380 (N)2500 PSI CONERETE
<br /> TUBE TYPE "L" TUBE TYPE "M" MAX LENGTHS,(FEET) 45 60 120 212 300 390 510 7" (E)SLAB
<br /> SANITARY WASTE CAST IRON/ABS CAST IRON/ABS RATE OF CONSUMPTION 774,000/1,000 = 774 CFH
<br /> 7" MIN
<br /> �r �� ,a `
<br /> STORM DRAIN CAST IRON CAST IRON MAIN GAS LINE LENGTH TO METER = 150 FT.
<br /> � PLUMBING NOTES
<br /> �� (E) DIRT
<br /> GAS BLACK STEEL INSIDE, GALVANIZED OUTSIDE
<br /> GAS LINE SIZE = 2 INCH �~ �~
<br /> GRAVEL
<br /> INDIRECT DRAIN HARD TEMPER, COLD DRAWN COPPER �� ��7/5\ X � A A Xv
<br /> PIPE QRUESSloN
<br /> TUBE TYPE "M" SAND
<br /> VAPOR BARRIER,6 MIL. F
<br /> ALL HOSE BIBB SHALL HAVE NON-REMOVABLE VACUUM BREAKERS.
<br /> AND NO PARALLEL VENT IS ALLOW TABLE 1215.2(1) CONCRETE SLAB REPAIR DETAILS No.
<br /> SCHEDULE 40 METALLIC PIPE[NFPA 54:TABLE 6.2(b)] 6-30-23
<br /> NOTE:
<br /> GAS: NATURAL NO SPECIAL INSPECTION IS REQUIRED �TgTF OF CA��Fo��P
<br /> INLET PRESSURE: LESS THAN 2 psi FOR EPDXY REBAR DOWELS.
<br /> PLUMBING FIXTURES SCHEDULE
<br /> PRESSURE DROP: 0.5 in w.c.
<br /> ID DESCRIPTION WATER PIPE DRAIN TO REMARKS MODEL# SPECIFIC GRAVITY: 0.60
<br /> FIXTURE SIZES SANITARY
<br /> Designed by : T.W
<br /> COLD HOT WASTE
<br /> PIPE SIZE(inch) COUNTERTOP
<br /> 3-TUB SINK 1/2" 1/2" YES ADVANCE TABCO #FC-3-1818-24RL NOMINAL: 1/2 3/4 1 11/4 11/2 2 21/2 3 4 ter Date : Mar 26, 2022
<br /> PREP-SINK 1/2" 1/2" YES YES INDIRECT DRAIN #FC-1-1818 ACTUAL ID: 0.622 0.824 1.3049 1.380 1.610 2.067 2.469 3.068 4.026
<br /> Scale : AS SHOWN
<br /> HAND SINK 1/2" 1/2" YES ADVANCE TABCO PS-60
<br /> WATER HEATER 3/4" 3/4" P/T RELEASE TO THE MOP SINK. LENGTH (ft) CAPACITY IN CUBIC FEET OF GAS PER HOUR
<br /> Drawn : W.P.D.
<br /> WITH EXPANSION TANK PHEEM
<br /> 10 172 360 678 1,390 2,090 4,020 6,400 11,300 23,100
<br /> MOP SINK vr' 1/2° YES FLOREsroNE #MSR 2424 20 118 247 466 957 1,430 2,760 4,400 7,780 15,900 MIXING VALVE CHROME PLATED BRASS Job
<br /> TOILET BOWL 1/2" 1/2" YES 1.28 GAL./FLUSH KOHLER K-3544 30 95 199 374 768 1,150 2,220 3,530 6,250 12,700 TAILPIECE & P-TRAP
<br /> RESTROOM LAV. 1/2" 1/2" YES INSULATE HOT/COLD/WATER PIPE&"P" 40 81 170 320 657 985 1,900 3,020 5,350 10,900 1/2" HOT WATER SUPPLY 1/2" COLD WATER SUPPLY SHEET
<br /> TRAP LINE SET TEMP TO 120°.0.4 GPM KOHLER K-2005 50 72 151 284 583 873 1,680 2,680 4,740 9,660
<br /> FLOOR DRAIN YES ZURN Z415 60 65 137 257 528 781 1,520 2,430 4,290 8,760 1/4" TURN CHROME
<br /> FLOOR SINK YES ZURN Z 566 70 60 126 237 486 728 1,400 2,230 3,950 8,050 PLATED BRASS STOP 1/4" TURN CHROME
<br /> P 1
<br /> 80 56 117 220 452 677 1,300 2,080 3,670 7,490 PLATED BRASS STOP
<br /> NOTE: 90 52 110 207 424 635 1,220 1,950 3,450 7,030
<br /> 1: WATER PIPE MATERIAL TO BE COPPER. 100 50 104 195 400 600 1160 1840 3 2 MIXING VALVE DETAIL FOR LAVATORY SINK 2: VENT PIPE MATERIAL USE ABS , , , 6O 6,640 OF SHEETS
<br /> 3: WATER PIPE MATERIAL USE COPPER TYPE M ABOVE FLOOR,COPPER TYPE K BELOW FLOOR 125 44 92 173 355 532 1,020 1,630 2,890 5,890
<br /> 4: ALL HOSE BIBB SHALL HAVE NON-REMOVABLE VACUUM BREAKERS
<br /> 5: GAS PIPE MATERIALS USED BLACK IRON. 150 40 83 157 322 482 928 1,480 2,610 5,330
<br />
|