My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:22 PM
Creation date
1/25/2023 9:47:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard X Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum X Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-87-PS 2-87-PS 3-91-PS <br /> Sump Manufacturer XERXES XERXES XERXES <br /> Sump Depth (inches) 45" 48" 49" <br /> Sump Bottom to Top of 15" 16" 16" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 8:42 8:47 9:32 <br /> Initial Reading .001 .001 .001 <br /> Test End Time 9:12 9:17 10:02 <br /> Final Reading .001 .001 .001 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 <br /> Tightness Test Results X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br /> Sump Manufacturer Western FG Western FG Western FG Western FG <br /> Sump Depth (inches) 32" 32" 32" 32" <br /> Sump Bottom to Top of 11" 11" 11" 11" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 8:52 8:57 9:42 9:47 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 9:22 9:27 10:12 10:17 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.