Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-CD-PS 2-DD-M-PS 3-DD-Siph-PS 4-Kero-PS <br /> Sump Manufacturer Western FG WesternFG Western FG Western FG <br /> Sump Depth (inches) 35 1/2" 49" 51" 27" <br /> Sump Bottom to Top of 10" 23" 21" 9 1/2" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:57 9:52 10:37 8:47 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 10:27 10:22 11:07 9:17 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Lss/FailCriteria > .002 > .002 > .002 > .002 <br /> htness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID 5-Race 11 OPS <br /> Sump Manufacturer Western FG <br /> Sump Depth (inches) 38" <br /> Sump Bottom to Top of 13" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 8:42 <br /> Initial Reading .001 <br /> Test End Time 9:12 <br /> Final Reading .001 <br /> Change in Reading 0 <br /> Pass/Fail Criteria > .002 <br /> Tightness Test Results ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4of6 <br />