Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard 0 Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 11&12-M UDC 13&14-DD UDC 11&10-S UDC 10&9-M <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 33" 33" 33" 33" <br /> Sump Bottom to Top of 15" 15" 15" 15" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:57 10:52 10:42 10:47 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:27 11:22 11:12 11:17 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID UDC 9-S UDC 7&8-AD UDCKero/Race <br /> Sump Manufacturer Bravo Bravo Western FG <br /> Sump Depth (inches) 30" 30" 27" <br /> Sump Bottom to Top of 11" 11" 10 1/2" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:02 11:07 8:52 <br /> Initial Reading .001 .001 .001 <br /> Test End Time 11:32 11:37 9:22 <br /> Final Reading .001 .001 .001 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ❑x Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 6 <br />