My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
166
>
2800 - Aboveground Petroleum Storage Program
>
PR0515523
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 8:09:34 AM
Creation date
2/28/2023 8:23:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0515523
PE
2832
FACILITY_ID
FA0006289
FACILITY_NAME
VALLEY PACIFIC PETROLEUM SERVICES
STREET_NUMBER
166
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342003
CURRENT_STATUS
01
SITE_LOCATION
166 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />know if you need more than the previously submiƩed RTC leƩers and correspondence informaƟon to close out these <br />inspecƟons. Valley Pacific values the work SJCEHD does for environmental compliance and we see you as a valuable <br />partner in our success. Feel free to reach out anyƟme with quesƟons or comments. I'll try calling again Monday to follow <br />up. <br /> <br />Summary <br />February 23, 2022 - SJCEHD inspected the Valley Pacific facility located on Frank West Circle for Hazardous Waste (HW) <br />and APSA compliance. InspecƟon reports were received via email later that day <br /> <br />February 24, 2022 - SJCEHD noƟfied Valley Pacific via email that the report will be revised to include more details in the <br />exisƟng violaƟons <br /> <br />March 1, 2022 - SJCEHD emailed an amended HW inspecƟon report <br /> <br />March 2, 2022 - SJCEHD noƟfied Valley Pacific via email that SJCEHD is looking into the potenƟal tank in an underground <br />area (TIUGA) and will reach out to Valley Pacific with more informaƟon. <br /> <br />March 30, 2022 - Valley Pacific emailed completed RTC documentaƟon for both HW and APSA programs. <br /> <br />April 5, 2022 - Valley Pacific followed up via email with SJCEHD to see if any further acƟon was required. SJCEHD <br />confirmed no further requests at this Ɵme <br /> <br />May 9, 2022 - Valley Pacific followed up with SJCEHD via email to see if any further acƟon was required. SJCEHD <br />confirmed no further requests at this Ɵme <br /> <br />June 6, 2022 - Valley Pacific provided an electronic copy of the SPCC Plan to SJCEHD via email for review. The email <br />included our understanding that all documented HW and APSA violaƟons had been addressed and corrected. The <br />installaƟon of the berm idenƟfied in the completed SPCC Plan update would be completed by October 31, 2022. <br /> <br />October 3, 2022 - Valley Pacific provided SJCEHD an update and photographs of the completed berm already included in <br />the June 2022 revised SPCC Plan. The email included a request to acknowledge a successful return to compliance. <br />SJCEHD responded that it is being forwarded to a lead supervisor for review. <br /> <br />February 27, 2023 - 10:19am: SJCEHD emailed Valley Pacific that APSA violaƟons 301 and 712 were sƟll open and <br />requested proof that items were addressed in the SPCC Plan. 10:17pm: Valley Pacific provided previous emails and a <br />brief statement of understanding indicaƟng these violaƟons had already been addressed. <br /> <br />March 3, 2023 - Hardcopy noƟces from SJCEHD were received by Valley Pacific regarding open violaƟons including HW <br />ViolaƟon #502 and APSA ViolaƟons #301, #712. <br /> <br /> <br /> <br />ViolaƟons Response <br />HW ViolaƟon #502 - Tank system inspecƟons of discharge systems, monitoring equipment, and tank levels not done <br />daily. <br /> <br />According to the RTC LeƩer from March 30, 2022, this violaƟon had been addressed. The text from the RTC leƩer is <br />included below "InspecƟons of the waste oil tank (SPCC Plan - AST-8) are conducted consistent with Hazardous waste <br />regulaƟons. Site personnel responsible for inspecƟons have been trained on the hazardous waste container inspecƟon <br />requirements. The training roster has been included for reference." <br /> <br />Valley Pacific received no response from SJCEHD unƟl receiving the noƟce dated February 27, 2023.
The URL can be used to link to this page
Your browser does not support the video tag.