Laserfiche WebLink
Soil Suitability and Nitrate Loading Study <br /> UNION PACIFIC RAILROAD - LATHROP <br /> 1000/1012 East Roth Road, French Camp, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 9.0. IMPACT OF NITRATE TO GROUNDWATER .................................................... 10 <br /> 9.1. CURRENT OFF-SITE SOURCES OF NITRATE ............................................. 10 <br /> 9.2. IMPACT OF RAINFALL CONTRIBUTION TO NITRATE LOAD ...................... 10 <br /> 9.3. CURRENT ON-SITE SOURCES OF NITRATE ............................................... 11 <br /> 9.4. FUTURE ON-SITE SOURCES OF NITRATE .................................................. 11 <br /> 9.5. DENITRIFICATIONS CAUSED BY SOILS....................................................... 11 <br /> 9.6. MASS BALANCE OF NITROGEN LOADING .................................................. 11 <br /> 9.7. IMPACT OF NITROGEN LOADING FROM SITE PROJECT TO DOWNGRADIENT <br /> WATER SOURCES........................................................................................... 13 <br /> 10.0. TOTAL NITRATE IMPACT FROM PROPOSED PROJECT............................... 13 <br /> 11.0. MITIGATION METHODS PROPOSED ............................................................... 13 <br /> 12.0. CONCLUSIONS AND RECOMMENDATIONS................................................... 13 <br /> 13.0. LIMITATIONS ..................................................................................................... 14 <br /> FIGURES <br /> Figure 1 — Location Map <br /> Figure 2 — Site Plan <br /> APPENDICES <br /> Appendix A— Utility plans <br /> Appendix B — Parcel Vicinity Map/Air Photo and Information <br /> Appendix C — Onsite Septic/Well Permits <br /> Appendix D — Onsite Wastewater Treatment System Report <br /> Appendix E — Percolation Test Rate <br /> Appendix F — CIMIS Rain Evapotranspiration Report 2018-2022 <br />