Laserfiche WebLink
STI P-001 AST Annual Inspection Checklist <br /> General Inspection Information: <br /> InspHCtran Date' T Ptiar Inspr`cilon Date. Ralafn unto date. <br /> Irispector Name(pnnt)- � x� _ Tltla- _ ` ,L <br /> InspeGtore Signature: <br /> Tank(s)inspected ID 15;,p,4-XA5 000 <br /> Regulatory facility rrarneand !❑numb❑r(d applicable) <br /> Inspection Guidance- <br /> This checklist isintanded as a model Locally developed checklislsare acceptable as long as they are subs#ant,allyequivalent(as applicable) <br /> For equipment not inoluded in this Standard,fPllmw the manutactumi-recommended inspectioNtesting schedules and procedures. <br /> The penodie AST I nspactivn'is irdpnded for monitoring the exlemal AST coridilian and its containment structure.This visual inspection does not require a C"FriFed <br /> Inspector. It shag be perfonrred by an owner's inspector per paragraph 4 1.2 of the stl3ndard. <br /> Remove promptly standing waiar or liquid discovered in the primary tank,secondary containment area,interstice,or splrl container.Before dlsnMarge to the <br /> ca,viron Ment,inspect the liquid For regulated products or other wntaminants and disposed of it property <br /> rn order to comply with EPA SPCC (Spill Preverklari,Control and Countermeasure)rules,a facility shouia reguiarly test liquid levol sena>ng aevin"to ensure proper <br /> operanan{40 CFR 112.A{c){8){v}). <br /> F f'lbn-i--lnforming dbms important tq tank or containment Mtenrtty rfglJim evaluadon by an engindr,�r iikpLTMMCed In AST design,a Certified Inspector,or a tank <br /> manul'r mi-who will determine the correcWr action.Nate the non-confurmance ane corfespanding win-w-tiwe action In the cam menr section <br /> F Reza.--n the completed eheeldists for at least 36 manlhy <br /> F Corn*to this cherdst on an annuar basis,9+ipplerrimtal to the owrle!monthly-perfarmed inspegrtpn checklists <br /> r Note:It a Phange has occurred to the tank system or contalnmerot that may affect the SPCC pian,tyre condition should he evaluated against the currpnt plan <br /> requirement by a Professianal En gin earknowladgeablo in SPCC development snd implementation_ <br /> ITEFA STATUS COMM ENTS I DATE CORRECTED <br /> Tank FoundationiSupports <br /> 9 <br /> Free grliinksenlemBworTaunaenonwsshaur Xyes ONo <br /> 2 Conrtere pad or rmg wall l&-eA rracJung andENO n NrX <br /> spelling"+ �� <br /> Annual Checklist Page 1 of 4 <br /> r <br />