My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 3:15:53 PM
Creation date
3/22/2023 8:27:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0516526
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1553 COLONY RD RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 9-Dsl-21-S 10-Dsl-22-S 11-Ds1-23-S 12-Ds1-24-S <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 8:35 8:38 8:41 8:44 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 9:35 9:38 9:41 9:44 <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID 13-Ds1-25-S 14-Ds1-26-S 15-Ds1-27-S <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 8:48 8:51 8:53 <br /> Initial Reading 5 Psi 5 Psi 5 Psi <br /> Test End Time 9:48 9:51 9:53 <br /> Final Reading 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.