My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:58:23 PM
Creation date
3/29/2023 10:22:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231631
PE
2361 - UST FACILITY
FACILITY_ID
FA0000091
FACILITY_NAME
H&S Energy Products,#3038
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
14000 E STATE ROUTE 88 LOCKEFORD 95237
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer 0✓ Industry Standard © Professional Engineer <br /> Test Type 0 Pressure Vacuum ❑I— Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87 91 Diesel <br /> Tank Manufacturer Modern Modern Modern <br /> Tank Capacity 12k 8k 10k <br /> Test Start Time 09:31 09:39 09:43 <br /> Initial Reading -10 Hg -10 Hg -10 Hg <br /> Test End Time 10:31 10:39 10:43 <br /> Final Reading -10 Hg -10 Hg -10 Hg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/-0 +/-0 +/-0 <br /> Tightness Test Results M✓ Pass [n Fail ® Pass © Fail ® Pass © Fail © Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 0 Vacuum © Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID 87 91 Diesel <br /> Pipe Manufacturer Ameron Ameron Ameron <br /> Test Start Time 09:40 09:42 09:45 <br /> Initial Reading 5 Psig 5 Psig 5 Psig <br /> Test End Time 10:40 10:42 10:45 <br /> Final Reading 5 Psig 5 Psig 5 Psig <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/-0 +/-0 +/-0 <br /> Tightness Test Results Pass El Fail 71 Pass ® Fail I ©✓ Pass ID Fail 0 Pass 0 Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass 0 Fail C Pass © Fail I 0 Pass [C] Fail C Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.