My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2024 4:25:57 PM
Creation date
4/3/2023 9:37:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION MANUAL <br /> FOR A BRAVO CONV=RETROFIT-PLATE KIT <br /> INSTALLING CONTRACTOR MUST BE BRAVO CERTIFIED TO INSTALL <br /> THIS PRODUCT AND AUTHORIZED IN WRITING BY BRAVO PER THE <br /> INSTRUCTIONS OUTLINED IN " Bravo_CONV_ Retrofit_ Plan _ R1 . pdf " <br /> ALL DOCUMENTS FOUNDAT www . sbravo . com / conv <br /> The following is a Bravo Factory -Approved procedure for the State Approved UDSCCS Bravo CONV <br /> B2000 Dispenser Conversion Frame . This retrofit procedure is necessary when the existing conduits are <br /> protruding through the concrete on the exterior of the existing UDC . <br /> NOTE : The drainage panels ( downward - angled steel panels ) of the conversion frame that channels any <br /> leaking fuel to the UDC ' s interior do not have the openings for the conduits pre -cut by the factory. <br /> A Bravo -Certified contractor is required to cut openings in these panels in the field . Please review the <br /> following guidelines . <br /> CRITICAL CONTACT RULE : You must maintain a minimum of <br /> one full inch ( 1 " ) of contact between the FRP retrofit plate and the steel <br /> louvers on all edges except the edge nearest the center of the UDC . <br /> STEP 1 ) You must make the openings that you cut as small as possible in diameter. Depending <br /> on the situation , E -Y ' s or other threaded components will require larger diameter holes to be cut in the <br /> frame . Precisely measure the electrical components that must protrude through the frame and cut out <br /> each shape as closely as possible . <br /> STEP 2 ) When the holes have been made for all conduit protrusions , dry-fit the modified <br /> conversion frame and re - cut as necessary. <br /> STEP 3 ) Then drill a hole in the FRP plate as close to the conduit diameter as possible , for each <br /> location . Plan your hole saw cuts so that they are well spaced and all inside the FRP plate . If conduits <br /> are too close together, you may cut a single hole/window for multiple conduits to protrude through . <br /> STEP 4 ) Then cut the FRP plate in half centered as much as possible along the holes you have <br /> made in it . Dry fit this retrofit plate to the conduits and check for proper fit and contact per the <br /> CRITICAL CONTACT RULE . Re - cut and dry-fit the FRP plate as necessary until it' s edges can meet <br /> without issue and the plate sits squarely flat against the remainder of the steel louvers . <br /> STEP 5 ) Prepare all contact surfaces that will be bonded together by abrading them by hand with <br /> low-grit sandpaper. Make sure to rough up the epoxy- coated steel louvers for maximum bond <br /> strength . <br /> 1 ii -CONV- Retrofit- Plate - 12B - 9/24/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.