Laserfiche WebLink
LI <br />7. Roads necessary for the safe operation of Forward Landfill during inclement <br />weather have been Winterized with layers of Road Base, Gravel, Asphalt and or <br />Recycled Asphalt. Roads have been graded in such a way as to direct water to the <br />appropriate collection point. All roads will be cleaned as needed to prevent the <br />build up of mud and tracking of mud from Forward Landfill on to Austin Road. <br />a. Due to the construction of WMU D99 it has been necessary to build a new <br />access road from the western boundary of Forward to the entrance of WMU D99. <br />This road has a compacted clay base with an additional six inches (6) of road base <br />then approximately three inches (3) of recycled A -B and Road Oil to bind the <br />material together. A thin layer of sand was then applied to absorb any excess oil. <br />Winter2000.doc <br />