Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MANTECA CHEVRON as of April 04, 2023. <br /> Open violations from May 16, 2022 inspection <br /> Violation#107-Failure to submit and maintain complete and current financial responsibility documents. <br /> 1)OBSERVATION: Financial responsibility documents have not been submitted to the EHD. The most recent <br /> financial responsibility documents in CERS are dated 06/19/2020. <br /> REGULATION GUIDANCE: Current financial responsibility documents are required to be submitted annually. <br /> CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS)at <br /> http://cers.calepa.ca.gov/, and upload the required documents. <br /> 2)OBSERVATION: Current financial responsibility documents were not found on site. <br /> REGULATION GUIDANCE:A copy of current financial responsibility documents are required to be maintained on <br /> site. <br /> CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br /> copy on site. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#122-Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION:An inspection was last done on 05/19/2021 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 06/18/2021. This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 3 <br />