Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MANTECA CHEVRON as of April 04, 2023. <br /> Open violations from May 16, 2022 inspection <br /> Violation#208-Failure to comply with the designated operator inspection requirements. <br /> 1)OBSERVATION:The designated operator inspections for the following months were performed more than 30 <br /> days after the previous inspection: <br /> - Initial inspection on 4/8/2021, next inspection performed on 06/03/2021 (59 days between the two dates) <br /> -The Owner/operator did not provide follow up actions to compliance issues from section 3 from DO report of <br /> 02/11/2022. <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection. <br /> CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> 2)OBSERVATION:The designated operator failed to check and note all required items on the visual inspection <br /> reports.The incorrect and missing information included the following from the inspection reports: <br /> -The DO report of 3/11/2022 did not include the owner/operator name. <br /> REGULATION GUIDANCE: During the visual inspection,the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#315-Failure to maintain interstitial space to detect leaks before release to environment(post-Jul <br /> 2004). <br /> OBSERVATION: The 91 S-12 (smart)sensor failed when tested. <br /> REGULATION GUIDANCE: The interstitial space of the UST shall be maintained, as designed, under constant <br /> vacuum or pressure such that a breach in the primary or secondary containment is detected before the hazardous <br /> substance is released into the environment. <br /> CORRECTIVE ACTION: Correct immediately by having a properly licensed,trained, and certified contractor replace <br /> the failed component with a functional component(LG 113-x listed, if applicable), and obtain a permit within one <br /> business day from the EHD, if needed. If the failed component can't be replaced immediately,there is a possibility <br /> that the 91 UST system may be red tagged to prevent fuel inputs. <br /> Page 2 of 3 <br />