My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2023 1:41:41 PM
Creation date
4/12/2023 1:10:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
SYSTEM TRANSPORT
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Vacuum Pump/Vacuum Gauge in Hg. <br />Tank ID 1-Diesel <br />Tank Manufacturer XERXES <br />Tank Capacity 11,527 Gal <br />Test Start Time 8:50 <br />Initial Reading -10" Hg. <br />Test End Time 9:50 <br />Final Reading -10" Hg. <br />Change in Reading 0" Hg. <br />Pass/Fail Criteria No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Pipe Run ID 1-Dsl-Master 2-Dsl-Sat-N 3-Dsl-Sat-S <br />Pipe Manufacturer Smith Smith Smith <br />Test Start Time 8:35 8:40 8:45 <br />Initial Reading 5 Psi 5 Psi 5 Psi <br />Test End Time 9:35 9:40 9:45 <br />Final Reading 5 Psi 5 Psi 5 Psi <br />Change in Reading 0 Psi 0 Psi 0 Psi <br />Pass/Fail Criteria No Loss No Loss No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br />6. TANK SECONDARY CONTAINMENT TEST <br />7. PIPE SECONDARY CONTAINMENT TEST
The URL can be used to link to this page
Your browser does not support the video tag.