Laserfiche WebLink
<br /> <br /> <br /> made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID 1-Diesel-PS 1-UDC-Master 2-UDC-Sat-N 3-UDC-Sat-S <br />Sump Manufacturer XERXES OPW OPW OPW <br />Sump Depth (inches) 48" 32" 28" 28" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />16" 12" 10" 10" <br />Test Start Time 8:47 8:52 9:32 9:37 <br />Initial Reading .001 .001 .001 .001 <br />Test End Time 9:17 9:22 10:02 10:07 <br />Final Reading .001 .001 .001 .001 <br />Change in Reading 0 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br /> <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST