My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 HEATH & SAFETY PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023 HEATH & SAFETY PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:25:00 AM
Creation date
4/13/2023 2:03:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 HEATH & SAFETY PLAN
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Type <br />Surrounding Land Use and Topography <br />Simultaneous Operations (SimOps) <br />Site Background <br />The project site is an active facility with the following attributes: <br />Correctional Facility <br />Commercial <br />Residential <br />Site background information is located in the project work plan. <br />The surrounding area is primarily rural farm land and agricultural plots. To the north of the landfill <br />and the east of the residentiual property there is a prison with associated security. <br />The correction facility has 2 controled units for juvanile and adult inmates. <br />Planned Arcadis site work will not be in proximity to SimOps work activities performed by non <br />Arcadis employees or subcontractors. Arcadis will initiate stop work and evaluate the work <br />activities through the JSA process if during the course of work a SimOps activity is identified that <br />could reasonably affect health and safety of Arcadis employees and subcontractors. <br />The primary site the active Republic Services Landfill, with VOC groundwater impacts primarilty <br />relating to PCE and TCE. <br />The project has extended off-site to an adjacent, residential property, with TCE impacts. <br />Also additional project location is located inside the grounds of an active correctional facility, with <br />carbon tetrachloride, chloroform and PCE, TCE groundwater impacts.
The URL can be used to link to this page
Your browser does not support the video tag.