My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 HEATH & SAFETY PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023 HEATH & SAFETY PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:25:00 AM
Creation date
4/13/2023 2:03:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 HEATH & SAFETY PLAN
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Tasks <br />The following tasks are identified for this project: <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />The following documents and/or plans associated with the above task(s) are required and attached: <br />X Required Checklists/Work Forms x Required Permits <br />X Required H&S Standards <br />Select <br />- The Arcadis Utilities and Structures Checklist must be used for utility clearance activities. <br />- A California Heat Illness Prevention Plan (HIPP) and Injury and Illness Prevention Plan (IIPP). <br />- Current Arcadis COVID-19 Prevention Recommendations and Guidance <br />Sampling - Pressurized air sampling using sample cylinders or similar devices <br />Sampling - Groundwater sampling using bailers (contractor oversight) <br />Soil Vapor Probe Installation <br />Bloodborne Pathogens_ARC HSGE005 <br />First Aid/CPR_ARC HSGE004 <br />Select <br />Select <br />Select <br />Select <br />Select <br />Select <br />Select <br />Utilities - Clearance <br />Drilling - Contractor oversight <br />Decontamination - Arcadis oversight of contractors performing decontamination <br />Waste- Arcadis oversight of contractors performing IDW containment, segregation and/or sampling <br />Monitor well - Well installation, development, or purging contractor oversight <br />Aquifer testing - Using mechanical methods <br />Select <br />Monitoring - Air monitoring using hand held or stationary equipment - non-radiation <br />Mobilization - Site set up and take down <br />Select <br />Tailgate Safety Briefing Form <br />Heat Stress Prevention_ARC HSIH013 <br />SSEs are identified in the Roles and Responsibilities section of this HASP. Project team must ensure <br />SSEs with <1 year of exerience at Arcadis working on this project have completed: 1) participation in <br />New Hire Call within 7 days, 2) complete New Hire Orientation within 14 days, 3) complete SSE TIP as <br />observee within 60 days, and 4) complete the SSE Culture Assessment between 60-90 days of hire. <br />Inexperienced Workers must be assigned a mentor for new or unfamiliar task work (ARC HSGE019). <br />Vehicle Inspection Checklist <br />Utilities and Structures Checklist <br />Equipment lists for CDCR Property <br />Short Service Employees (SSEs) <br />Groundwater Well Installtion
The URL can be used to link to this page
Your browser does not support the video tag.