My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOEING
>
2452
>
1900 - Hazardous Materials Program
>
PR0546193
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2023 4:46:05 PM
Creation date
5/8/2023 4:23:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0546193
PE
1921
FACILITY_ID
FA0026142
FACILITY_NAME
ES OPCO USA LLC
STREET_NUMBER
2452
STREET_NAME
BOEING
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2452 BOEING WAY STE 100
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VES E R IS <br />Contingency Plan <br />Section 3 — Effective Date Supersedes Page <br />Branch Safety Organization 9/20/2021 New 3-5 <br />Ensure that all fire/spill response team members are familiar with the <br />hazards of the products we handle, and the potential emergencies <br />related to these products. <br />Ensure that fire/spill response team members understand that they are <br />not trained or equipped to handle a major fire. They must know their limits <br />and always stay within their capabilities. <br />Ensure that all equipment identified in the plan for use by the fire/spill <br />response team is on hand, is in operating condition and is specifically <br />marked and set aside for use by the fire/spill response team as <br />applicable. <br />He/she will coordinate members of the fire/spill team(s) during an <br />emergency. <br />VI. Assembly Point Leader(s) <br />Assembly Point Leader(s) will be identified for all areas of a branch -- i.e., <br />the office, the warehouse, and the repack areas. It is their responsibility to: <br />Turn off the main electrical power switch in the building for which they <br />have responsibility. <br />Close doors and windows if there is time to do so safely. <br />Proceed directly to the assembly area(s) as outlined in the evacuation plan. <br />Account for all personnel assigned to their area and report any <br />absences to the Emergency Coordinator. Ensure contractors onsite <br />are accounted for. <br />Keep personnel in assembly area calm and together. <br />F Coordinate with the First Aid Team Leader(s) and the Emergency <br />Coordinator as appropriate.
The URL can be used to link to this page
Your browser does not support the video tag.