Laserfiche WebLink
7/13/22,11:29 AM UST Program:Monitoring Plan for UST Tank...:CERS Business <br /> California Environmental Reporting System:Business Andrew 5jgn_Q_ijt jQ015 RepDrt hLP_112 <br /> UST Monitoring Plan: ARCO ampm <br /> Home )> Suhrn,qail History )> Submittal Tri V2022 00642625i >> UST,US-1 f-4cnitorng Plan.fS1jbrnitteO) <br /> LIST Tank#TA0520833-01 <br /> A UST monitoring plan must be completed for each tank/UST System entered into CERS.This form must be updated within 30 days of changes in the information it contains. <br /> Please note that your local agency may require you to obtain approval prior to installing or modifying monitoring equipment. <br /> Select Edit to modify this monitoring plan. <br /> UST monitoring plans must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed.Provide this document using the LIST <br /> Monitoring Site Plan supplemental documentation found elsewhere in the LIST submittal element. <br /> Submittal Element Histo --- <br /> Submitted for CERS ID 10842625 on 7/13/2022 11:26AM by Andrew 8 Qtista of ARCO arnprn Manteca,CA) <br /> V&W Erstim Submittal Start Ne. <br /> V*W 760,InformAim <br /> opy Monitoring Plan Information <br /> This section would allow the user to copy Monitoring Plan information from another tank.This option would only appear if this facility had one or more existing <br /> tanks with Monitoring Plans. <br /> —Facility Information Equipment Testing and Preventive Maintenance— —Monitoring Locations <br /> ARCO ampm <br /> Monitoring Equipment Serviced Site Plot Plan Submitted <br /> 2056 Crestwood Ave Annually New Plan Submitted <br /> Manteca , CA 95336 <br /> —Tank Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Electronic Tank Monitoring 116 <br /> Secondary Containment System Monitor Panel Manufacturer Leak Sensor Manufacturer <br /> Liquid-Filled VEEDER-ROOT VEEDER-ROOT <br /> Monitor Panel Model Leak Sensor Model# <br /> TLS-350 PLUS 794380-303 <br /> No Automatic Tank Gauging 4 <br /> No Monthly Statistical Inventory Reconciliation 0, <br /> No Weekly Manual Tank Gauge <br /> No Tank Integrity Testing 4' <br /> No Other Monitoring <br /> —Pipe Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Monitoring of Piping Secondary Containment'# <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Under Vacuum VEEDER-ROOT VEEDER-ROOT <br /> Panel Model 9 Leak Sensor Model <br /> TLS-350 PLUS 794380-208 <br /> Leak Alarm <br /> Triggers Automatic Pump Shutdown <br /> Yes <br /> Failure/Disconnect Triggers Pump Shutdown <br /> Y.. <br /> Yes Mechanical Line Leak Detector Performs 3 OPH Leak Test* <br /> MILLI)Manufacturer MLLD Model <br /> Veeder Root PLLD <br /> No Electronic Line Leak Detector Performs 3 GPH Leak TestFb <br /> No Pipeline Integrity Testing V. No Visual Pipeline Monitoring 40 <br /> PipingNo Suction Meets Exemption Criteria* <br /> No No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> No Other Pipeline Monitoring 4 <br /> CERS Help <br /> ...............................---------............... <br /> https://cersbusiness2.calepa.ca.gov/204020/Faci lity/1 0842625/Submittal/UST/5642021 Won itoringPlan/Detail/25664901 1/2 <br />