Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> Date last <br /> p, TESTING AND MAINTENANCE <br /> Yes No NA performed <br /> Has monitoring system certification been completed within the past �- <br /> 6-16-2022 <br /> 12 months? ® 6-16-2022 <br /> Has spill container testing been completed within the past <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within 7-7-2020 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past ® ® vph <br /> 36 months? <br /> rl E2 <br /> Has tank tightness testing been completed within required <br /> timeframes? <br /> Has line tightness testing been completed within the required <br /> timeframes? <br /> � 4-29-2022 <br /> Other Test/ Maintenance: <br /> Other Test/ Maintenance: <br /> Other Test/ Maintenance: <br /> Yes No <br /> 11. FACILITY EMPLOYEE TRAINING <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All answers marked "No''must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br />