Laserfiche WebLink
Underground Storage Tank <br /> esi nated UST Operathr Visual Inspection Report <br /> � g Date last <br /> Yes No NA performed <br /> 10. TESTING AND MAINTENANCE r- g/1 g/22 <br /> Has <br /> monitoring system certification been completed within the past © ❑ <br /> 12 months? leted within the past 6/16/22 <br /> Has spill container testing been comp <br /> 12 months? leted within ❑ © 7/7/20 <br /> Has overfill prevention equipment inspection been comp <br /> the past 36 months? VPH <br /> Has secondary containment testing been completed within the past <br /> 36 months? © 0 <br /> Has tank tightness testing been completed within required <br /> timeframes? <br /> Has line tightness testing been completed within the required <br /> timeframes? © Q <br /> Other Test/ Maintenance: <br /> Other Test / Maintenance: <br /> Other Test / Maintenance: Yes No <br /> 11. FACILITY EMPLOYEE TRAINING <br /> Have all individuals performing facility employee duties received the required facility El <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> Tank and line tightness test is not required on double wall tanks and lines <br /> f <br /> All answers marked "No"must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br />