My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2024 2:00:43 PM
Creation date
5/9/2023 1:08:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
Harney Lane 76
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE pate last <br /> Yes :No NA perfe rued <br /> Has monitoring system certification been completed within the past <br /> 12 months? © © 6/16/22 <br /> Has spill container testing been completed within the past <br /> 12 months? 6/16/22 <br /> Has overfill prevention equipment inspection been completed within <br /> the past 36 months? 71 /20 <br /> Has secondary containment testing been completed within the past <br /> 36 months? â tâ 0 VPH <br /> Has tank tightness testing been completed within required <br /> timeframes? © © 0 <br /> Has line tightness testing been completed within the required <br /> timeframes? <br /> Other Test/ Maintenance: <br /> Other Test/ Maintenance: El <br /> © ® <br /> Other Test/ Maintenance: 0® El11. FACILITY EMPLOYEE TRAINING <br /> Have all individuals performing facility employee duties received the required facility Yes No <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current Compliance <br /> liance <br /> p <br /> Tank and line tightness test is not required on double wall tanks and lines <br /> H answers marked "No"must be described by the designated UST <br /> operator In Section 3. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.