Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE pate last <br /> Yes :No NA perfe rued <br /> Has monitoring system certification been completed within the past <br /> 12 months? © © 6/16/22 <br /> Has spill container testing been completed within the past <br /> 12 months? 6/16/22 <br /> Has overfill prevention equipment inspection been completed within <br /> the past 36 months? 71 /20 <br /> Has secondary containment testing been completed within the past <br /> 36 months? ❑ t❑ 0 VPH <br /> Has tank tightness testing been completed within required <br /> timeframes? © © 0 <br /> Has line tightness testing been completed within the required <br /> timeframes? <br /> Other Test/ Maintenance: <br /> Other Test/ Maintenance: El <br /> © ® <br /> Other Test/ Maintenance: 0® El11. FACILITY EMPLOYEE TRAINING <br /> Have all individuals performing facility employee duties received the required facility Yes No <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current Compliance <br /> liance <br /> p <br /> Tank and line tightness test is not required on double wall tanks and lines <br /> H answers marked "No"must be described by the designated UST <br /> operator In Section 3. <br /> Page 4 of 4 <br />