My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 11:28:20 AM
Creation date
5/18/2023 2:43:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1 100 Octane T2 91 T3 87 T4 Diesel <br /> Are both vent and tank riser piping ® Yes ® Yes 0 Yes ® Yes <br /> secondarily contained? ® No 0 No ® No No <br /> OPE Model Defender Defender Defender Defender <br /> What is the OPE response when ® Shut off ® Shut off ® Shut off ED Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) 0 Restricts DRestricts 0 Restricts 0 Restricts <br /> Flow Flow Flow Flow <br /> 0 Audible ® Audible 0 Audible ® Audible <br /> Alarm Alarm Alarm Alarm <br /> ® Visual ® Visual ® Visual ® Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ® Yes* 0 Yes* 0 Yes* 0 Yes* <br /> that may interfere with the OPE operation? ® No ® No ® No ® No <br /> At what level in the tank is the OPE set to <br /> $1" 81" $0.75" 105.5" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 93% 93% 93% 94% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to El Yes ® Yes* 0 Yes* ® Yes* <br /> respond when the stored substance 0 No 0 No ® No ® No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results 0 Pass 0 Pass 0 Pass ® Pass <br /> 0 Fail 0 Fail 0 Fail ® Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> 0 Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 A <br />
The URL can be used to link to this page
Your browser does not support the video tag.