Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> fi. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T5 <br /> Are both vent and tank riser piping Yes ® Yes Yes Yes <br /> secondarily contained? ® No ® No No ® No <br /> OPE Model Defender <br /> What is the OPE response when ® Shut off Shut off ® Shut off ® Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ® Restricts ®Restricts ® Restricts Restricts <br /> Flow Flow Flow Flow <br /> ® Audible Audible ® Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> ® Visual ® Visual ® Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ® Yes* ® Yes* ® Yes* ® Yes* <br /> that may interfere with the OPE operation? ® No ® No ® No ® No <br /> At what level in the tank is the OPE set to <br /> 105.75" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 94% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ® Yes ® Yes* ® Yes* ® Yes* <br /> respond when the stored substance ® No No ® No ® No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results Pass [M Pass El Pass ® Pass <br /> ® Fail ® Fail Fail Fail <br /> B. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Complete on SR:0087394 <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. Pa <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup reports) <br />