Laserfiche WebLink
Q: °;•a4ulN c° SANAOAQUIN Community <br /> Development Department <br /> ". VL COUNTY Planning Building Code Enforcement Fire Prevention GIS <br /> Greatness grows here. <br /> 41Fp Ra <br /> Phase 1 development. Generally, this will include improvements to South Chrisman Road, the main truck route for the <br /> project, and the following utilities improvements within the East District: installation of a potable groundwater well and <br /> treatment facilities,construction of a pre-packaged wastewater treatment plant(WWTP), construction of a large stormwater <br /> detention basin, and undergrounding of an existing irrigation district canal. <br /> A site plan for the project and Initial Phase development is shown below. <br /> C s <br /> _ Durham F--y 11—d <br /> Warehouse W;,ter Mostewmer, <br /> T.liverrnere Buildings f Utilities,and <br /> Detention Basin <br /> VFW Facility <br /> I <br /> I <br /> e <br /> University � w <br /> Legend <br /> General Indworial{I1GM <br /> Ger.rral Cnmmcr A cC/G] <br /> Public l PfF) <br /> ' 8-i—Park ve+..In Rp'd <br /> �y.• iD fvbdeilo <br /> .v Awvrn y <br /> swihc Plea eo.ndary <br /> T,I-S)Loi Angeles <br /> P A C I F I C GATEWAY <br /> L A N D U S E / I N I T I A L D E V E L 6 P M E N T P II A S E P L A N <br /> Long-Term Buildout <br /> Over the long-term, and based on historic industrial demand in Northern California and the Central Valley, the Industrial <br /> portion of the Specific Plan is anticipated to be completed within 28 to 30 years and the University Campus will be <br /> developed over an estimated 20-year period, based on student-demand. <br /> An Environmental Impact Report (EIR)will be prepared to evaluate environmental impacts associated with the project, and <br /> to consider possible mitigation measures which may be required. A separate Notice of Preparation will be prepared for <br /> the Draft EIR, and distributed to solicit agency and public comments on issues to be considered as part of the EIR <br /> analysis. <br /> APPLICATION REVIEW: No action is being taken on the project at this time. The project will be subject to public hearing <br /> reviews once the Draft EIR has been completed, anticipated by Fall 2023. The application review will entail review by the <br /> Planning Commission, who will provide a recommendation on the project to the Board of Supervisors. The Board will then <br /> consider the EIR and take action on the project applications. Notification of Planning Commission and Board of Supervisors <br /> public hearings will be provided at a later date, currently anticipated in late 2023. Please submit any initial comments on <br /> this application in writing by June 16, 2023 via email to: bmillar(-sigov.org. <br /> Link to Project Application Files: sigov.Iink/active-pIan ning-applications <br /> Pacific Gateway Referral 3 <br />