Laserfiche WebLink
Q: °;•a4ulN c°SANAOAQUIN Community <br />Development Department <br />".VL COUNTY Planning Building Code Enforcement Fire Prevention GIS <br />�Q.• - ...�c . Greatness grows here. <br />41Fp Ra <br />Phase 1 development. Generally, this will include improvements to South Chrisman Road, the main truck route for the <br />project, and the following utilities improvements within the East District: installation of a potable groundwater well and <br />treatment facilities, construction of a pre-packaged wastewater treatment plant (WWTP), construction of a large stormwater <br />detention basin, and undergrounding of an existing irrigation district canal. <br />A site plan for the project and Initial Phase development is shown below <br />Long -Term Buildout <br />Over the long-term, and based on historic industrial demand in Northern California and the Central Valley, the Industrial <br />portion of the Specific Plan is anticipated to be completed within 28 to 30 years and the University Campus will be <br />developed over an estimated 20 -year period, based on student -demand. <br />An Environmental Impact Report (EIR) will be prepared to evaluate environmental impacts associated with the project, and <br />to consider possible mitigation measures which may be required. A separate Notice of Preparation will be prepared for <br />the Draft EIR, and distributed to solicit agency and public comments on issues to be considered as part of the EIR <br />analysis. <br />APPLICATION REVIEW: No action is being taken on the project at this time. The project will be subject to public hearing <br />reviews once the Draft EIR has been completed, anticipated by Fall 2023. The application review will entail review by the <br />Planning Commission, who will provide a recommendation on the project to the Board of Supervisors. The Board will then <br />consider the EIR and take action on the project applications. Notification of Planning Commission and Board of Supervisors <br />public hearings will be provided at a later date, currently anticipated in late 2023. Please submit any initial comments on <br />this application in writing by June 16, 2023 via email to: bmillar(ci)_sigov.org. <br />Link to Project Application Files: sigov.Iink/active-pIan n1nq-applications <br />Pacific Gateway Referral 3 <br />C <br />s <br />_ <br />Durham F --y 11—d <br />Warehouse <br />W;,ter Mostewmer, <br />T. liverrnere <br />Buildings <br />Utilities, and <br />Detention Basin <br />VFW Facility <br />I <br />f <br />I <br />e <br />University <br />� w <br />Legend <br />General Induorial{I1Gj <br />Ger.rral Cnmmcr A (CIG] <br />Public jPjFj <br />' 8-i— Park <br />ve+..In Rp'd <br />1]: � iD fVbd[SIO <br />.J Awvrri y <br />swihc Plea eo.ndary <br />T, I-Sj Lm Angeles <br />PACIFIC GATEWAY <br />L A N D U S E/ I N <br />I T I A L D E V E L <br />6 P <br />M E N T P II A S <br />E P L A N <br />Long -Term Buildout <br />Over the long-term, and based on historic industrial demand in Northern California and the Central Valley, the Industrial <br />portion of the Specific Plan is anticipated to be completed within 28 to 30 years and the University Campus will be <br />developed over an estimated 20 -year period, based on student -demand. <br />An Environmental Impact Report (EIR) will be prepared to evaluate environmental impacts associated with the project, and <br />to consider possible mitigation measures which may be required. A separate Notice of Preparation will be prepared for <br />the Draft EIR, and distributed to solicit agency and public comments on issues to be considered as part of the EIR <br />analysis. <br />APPLICATION REVIEW: No action is being taken on the project at this time. The project will be subject to public hearing <br />reviews once the Draft EIR has been completed, anticipated by Fall 2023. The application review will entail review by the <br />Planning Commission, who will provide a recommendation on the project to the Board of Supervisors. The Board will then <br />consider the EIR and take action on the project applications. Notification of Planning Commission and Board of Supervisors <br />public hearings will be provided at a later date, currently anticipated in late 2023. Please submit any initial comments on <br />this application in writing by June 16, 2023 via email to: bmillar(ci)_sigov.org. <br />Link to Project Application Files: sigov.Iink/active-pIan n1nq-applications <br />Pacific Gateway Referral 3 <br />