Laserfiche WebLink
Q: °;•a4urN c°SANAOAQUIN Community <br />Development Department <br />".VL COUNTY Planning Building Code Enforcement Fire Prevention GIS <br />�Q.• - ...�c . Greatness grows here. <br />41Fp Ra <br />be necessary to support the project (including water, wastewater, storm water drainage and transportation/circulation plans), <br />along with implementation, financing and phasing plans. <br />Zone Reclassification No. PA -2100191: <br />Amend the Zoning designation of approximately 1,612 acres of land currently zoned General Agriculture (A/G-40) to provide <br />for a mix of approximately 1,532 acres of General Industrial (I -G), 66 acres of Public (P -F), 10 acres of General Commercial <br />(C -G) and 4 acres of Business Park (B -P) zoning designations. (See attached map of proposed Zoning map changes.) <br />Major Subdivisions Nos. PA -2300091 and PA -2300092: The first application would subdivide the entire project site into 28 <br />lots to create a master lotting configuration that will facilitate orderly development of the overall property; and the second <br />application, submitted as a Vesting Tentative Map, would comprise the 530.59 -acre East District area and create 19 lots <br />to facilitate the initial phase of the Industrial area (comprised of 140.7 net acres), as well as the acreage required for <br />backbone infrastructure, and the initial phase of the University Campus; <br />Site Approval Permit Nos. PA -2300093, PA -2300094 and PA -2300095: Applications for Phase 1 development of the <br />140.7 -acre Industrial Phase 1 area (-093) as well as the 29.1 -acre University Campus Phase 1 area (-094) and a VFW <br />facility meeting hall (-095). <br />Additionally, a Development Agreement is being sought by the applicant with the County to address specific details and <br />responsibilities related to project phasing, financing and project implementation. <br />Project Overview: The project includes the implementation of a Specific Plan that would result in up to 27,650,000 sf of <br />limited industrial use (this designation provides for a wide range of industrial uses, including general warehouse and logistics, <br />bulk storage, fulfillment centers and e-commerce, conditioned warehouse, and light manufacturing and assembly uses); <br />104,544 sf of general commercial uses (provide retail and additional services to support employee and student populations <br />in the adjacent industrial, business park, and University uses); 93,654 sf of business park uses (uses including, but not limited <br />to, uses requiring smaller spaces with up to 50 percent office, and the balance as warehouse); a 29 -acre private University, <br />VFW post, and various open space, park, pedestrian and bicycles facilities within a 1,612 -acre project site. The proposed <br />project includes site plan level entitlements at this time to allow development of an Initial Phase subsequent to EIR certification <br />and Specific Plan approval. This Initial Phase will focus on industrial development, as well as 29 acres within the University <br />area. The University of Silicon Andhra, currently located in Milpitas, California, will be building a new campus as part of the <br />Pacific Gateway Specific Plan. The campus is intended to provide opportunities for education and research in professional, <br />liberal arts, health, technology, sciences, and education sectors. <br />The Specific Plan area is divided into four development districts: East (including 315 acres in the Initial Phase) University <br />(including 29 acres of Initial Phase), Central, and West. Each district will be connected by a network of roads, and pedestrian <br />and bike paths will provide alternatives to vehicle trips. <br />Phasing <br />The proposed Specific Plan will be developed in phases based on market demand. This demand will guide buildings' size <br />and site configuration at the time of development and will follow Specific Plan and existing San Joaquin County requirements, <br />with supportive infrastructure and utilities provided. <br />Phase 1 Development Area <br />Development of the Initial Phase of industrial buildings will consist of five (5) Class "A" facilities totaling approximately 2.8 <br />million sf, ranging in size from approximately 97,000 sf to 1.16 million sf situated on 140.7 net acres (152.1 gross acres) <br />within the East District, with site coverage from about 36 percent to 49 percent. The Initial Phase will be comprised of rear - <br />loading and cross dock facilities, with the appropriate auto and truck trailer parking stalls. The Initial Phase is anticipated <br />to be developed over five to six years based on market demand, commencing with the initial construction of two buildings. <br />Phase 1 of the Specific Plan will also include a 140,200 sf Medical School facility within the University District, which will <br />serve as Phase 1 of the University Campus. The VFW facility will be developed concurrent with the Industrial and University <br />Campus initial phases'. The project will include a parcel for a new building and associated parking for the new home of <br />Tracy Post 1537. Phase 1 will also include construction of the necessary backbone infrastructure to serve the proposed <br />1 The VFW of the United States is a nonprofit veteran's service organization comprised of eligible veterans and military service members from the active, guard, and reserve forces. The VFW provides <br />a variety of programs and services that work to support veterans, service members and their families, as well as the community. <br />Pacific Gateway Referral 2 <br />