Laserfiche WebLink
PREVENTATIVE MAINTENANCE <br />Annually, Inspect the flapper In the 71501-0 see that it is <br />ripen by looking down the drop tube opening. Test the <br />71SO drop tube seals MO CARB procedure TP-201.10, <br />If the drop tube seal passes resting, no further mainte- <br />nance Is required, if the drop tube fails testing, replace <br />the drop tube seal with OPW P/N: H11931114 fOr 4' <br />Tubes Fie-ttnt the 7150 drop tube with CARR proce- <br />dure TP-Z01.1D. The lower tubeiaq wog seal OP W PIN; <br />H14.84041 can also De replaced. f this does not correct <br />the leak the 7150 heeds to be replaced. <br />FOR TESTABLE MODELS ONLY: The sock et adaptor <br />can be removed arid poppet arid float movement and <br />function nspected without removing the valve. See <br />Page 17 for Nil testing details replacement path are <br />needed to testable models the fo1ic:L*111v items Lre <br />available. OM PIN 206741 Testable Inlet Tube S/A. <br />206740 Socket Adaptor and Ca Me Assembly, and 6150K <br />CAUTION: Do not Insert any foreign object late drop <br />tube if flappes is In the dosed position. For exam- <br />ple, a tank level measuring stidc. This will damage <br />the with* and void the Warranty. ALWAYS check <br />flapper location before 'sticking* the tank If flap- <br />per Fs in the closed position the tank is either over- <br />filled and you need to wait until the liquid level goes <br />down or the 7150 iS damaged and needs to be ra- <br />7150 Performance Spedficatiens <br />This Overfill Prevention Valve has been manufactured <br />and tested to. t rid met the toll,ovoing California specifi- <br />mons. Performance Requirement: Leak rate to be less <br />than or equal to D.17 CFHeilr W.0 <br />Torque Specification <br />Taptne SCreWS, .10-24 thread [taring, 21:11n-lbs mini- <br />mum to 35 in-lbs maximum. Testable Models OnIT <br />Socket Adaptor, 1/4' NPT, JS ft-lbs 02 In-ths) minimum <br />to 5.0 ft-1b5 (60 in-113s) maximum. <br />IMPORTANT: Leave these Installation Instructions <br />and maintenance procedures with the swim open- <br />tor.