Laserfiche WebLink
Complaint Investigation Summary <br /> Report #: 5105 <br />COMPLAINT ID: C00053343 Site Location: 210 W BOWMAN RD <br />Activity Summary <br />Activity Date Recorded by <br />03/08/2023 210 W Bowman Rd., French Camp - Complaint reinspection. The inspection was SINGH <br />conducted with Derek Diep, EHST. We drove and viewed the property from <br />Bowman Rd. and from Manthey Rd. There is site activity and piles of material. <br />Note: <br />Multiple inspections conducted on this date, travel time varied. <br />03/08/2023 210 W Bowman Rd - Discussed complaint with Natalia S. and Stephanie R. SINGH <br />Reviewed file. <br />03/08/2023 I reviewed and discussed compliant with Sandip Singh, Sr. REHS. RAMIREZ <br />This complaint investigation was started by Pinne Chao, EHS. <br />Per Sandip she was at a site near this site with trainee, Derek Diep and she <br />observed activity. <br />She discussed complaint with PC, Natalia Subbotnikova, REHS. <br />Per Natalia the operator is to be contacted to ask the status of the operation and if <br />they ever completed the SWIS application (an application was found with the <br />compliant on Pinne's desk). <br />We also spoke with Caesar Lead Sr. REHS to find out if the parcel ever submitted <br />a Land Use application. <br />we found that there was a planning permit that was withdrawn for this parcel. <br />Sandip updated Natalia. <br />03/09/2023 210 Bowman Rd - Reviewed file. I called Vice President, Jason Pinger, at SINGH <br />209-547-0297. I left a message with a staff member by the name of Tim. <br />03/14/2023 210 W Bowman Rd - I received a voicemail from Jason Pinegar, Vice President, SINGH <br />stating he received a letter from EHD in November stating there is no further <br />actions that he has to take. Discussed with Natalia S. I called Mr. Pinegar and left <br />him a voicemail, I also emailed him. <br />03/20/2023 210 W Bowman Rd - Reviewed Injury & Illness Prevention Program, Report of <br />Composting Site Information, Chip and Grind Facility Operations Plan,and Fire <br />Prevention, Control and Mitigation Plan. <br />03/30/2023 210 Bowman Rd - Reviewed file. I called Mr. Pinegar to discuss the operation at <br />210 Bowman Rd., but he was unable to speak on the phone. I also emailed him to <br />try to schedule a time to discuss the operation. <br />04/03/2023 210 Bowman Rd - Reviewed Chip & Grind Operations regulations from <br />CalRecycle. <br />04/05/2023 210 Bowman Rd - Reviewed file. Reviewed regulations on Chip and Grind <br />Operations. Discussed site with Natalia S. and Stephanie R. <br />I emailed operator to schedule a follow up inspection in 30 days. The follow up is <br />scheduled for May 16, 2023 at 10 am. <br />SINGH <br />SINGH <br />SINGH <br />SINGH <br />sloarpt <br />Page 4 of 6