My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-OOXX 69 <br /> FORWARD, INC. <br /> FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> STANDARD PROVISIONS & REPORTING REQUIREMENTS <br /> 12. The Discharger shall maintain the depth of the fluid in the sump of each <br /> landfill unit at the minimum needed for efficient pump operation (the depth <br /> at which the pump turns on given the pump intake height and maximum <br /> pump cycle frequency). <br /> 13. The depth of fluid on the landfill liner shall not exceed 30 centimeters <br /> (cm) [40 C.F.R. § 258.40(a)(2)]. This regulation is interpreted by the <br /> Central Valley Water Board to exclude the leachate sump. The Discharger <br /> shall immediately notify the Central Valley Water Board staff by <br /> telephone, and follow up in writing within seven days if monitoring reveals <br /> that the depth of fluid on any portion of the liner (excluding the sump) <br /> exceeds 30 cm (approximately 12 inches). The written notification shall <br /> include a timetable for remedial or corrective action necessary to achieve <br /> compliance with the leachate depth limitation. <br /> 14. Each LCRS shall be tested at least annually to demonstrate proper <br /> operation. The results of the tests shall be compared with earlier tests <br /> made under comparable conditions [Title 27, § 20340(d)]. <br /> 15. The Discharger shall maintain a Storm Water Pollution Prevention Plan <br /> and Monitoring Program and Reporting Requirements in accordance with <br /> State Water Board Order No. 2014-0057-DWQ (Industrial General Permit) <br /> or most recent general industrial storm water permit), or retain all storm <br /> water on-site. <br /> 16. Internal site drainage from surface or subsurface sources shall not contact <br /> or percolate through wastes. <br /> 17. New MSW landfill units or lateral expansions of existing units shall not be <br /> sited in a "wetland" [as defined in 40 C.F.R. § 232.29(r)] unless there is no <br /> practical alternative; steps have been taken to assure no net loss of <br /> wetland; the landfill unit will not degrade the wetland; the unit will not <br /> jeopardize threatened or endangered species or produce adverse <br /> modification of a critical habitat or violate any requirement of the Marine <br /> Protection, Research, and Sanctuaries Act of 1972 [40 C.F.R. § 258.12]. <br /> F. Standard Construction Specifications <br /> 1. The Discharger shall submit for review and approval at least 90 days prior <br /> to proposed construction, design plans and specifications for new landfill <br /> modules that include the following: <br /> a. Detailed construction drawings showing all required liner system <br /> components, the LCRS, leachate sump, unsaturated zone <br />
The URL can be used to link to this page
Your browser does not support the video tag.