My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-OOXX 73 <br /> FORWARD, INC. <br /> FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> STANDARD PROVISIONS & REPORTING REQUIREMENTS <br /> 21. Leachate collection and removal systems shall be designed and operated <br /> to function without clogging through the scheduled closure of the landfill <br /> unit and during the post-closure maintenance period. <br /> 22. The LCRS shall be designed to maintain the depth of fluid over any <br /> portion of the LCRS of no greater than 30 cm [40 C.F.R. § 258.40(a)(2)], <br /> excluding the leachate sump. The leachate sump, leachate removal pump, <br /> and pump controls shall be designed and set to maintain a fluid depth no <br /> greater than the minimum needed for efficient pump operation [Title 27, <br /> § 20340(c)]. <br /> 23. All construction of liner systems and final cover systems shall be <br /> performed in accordance with a Construction Quality Assurance Plan <br /> certified by a registered civil engineer or a certified engineering geologist <br /> [Title 27, § 20323]. <br /> 24. The Construction Quality Assurance program shall be supervised by a <br /> registered civil engineer or a certified engineering geologist who shall be <br /> designated the CQA officer [Title 27, § 20324(b)(2)]. <br /> 25. The Discharger shall ensure that a third party independent of both the <br /> Discharger and the construction contractor performs all of the construction <br /> quality assurance monitoring and testing during the construction of a liner <br /> system. <br /> 26. The Discharger shall notify Central Valley Water Board staff at least <br /> 14 days prior to commencing field construction activities including <br /> construction of a new lined cell or module, construction of a final cover, or <br /> any other construction that requires Central Valley Water Board staff <br /> approval under this Order. <br /> 27. The Discharger shall submit for review and approval at least 60 days prior <br /> to proposed discharge, final documentation required in Title 27 Section <br /> 20324(d)(1)(C) following the completion of construction of a new lined <br /> landfill module. The report shall be certified by a registered civil engineer <br /> or a certified engineering geologist and include a statement that the liner <br /> system was constructed in accordance with the approved design plans <br /> and specifications, the CQA Plan, the requirements of the WDRs, and that <br /> it meets the performance goals of Title 27. The report shall contain <br /> sufficient information and test results to verify that construction was in <br /> accordance with the design plans and specifications, the construction <br /> quality assurance plan, and the performance goals of Title 27. <br />
The URL can be used to link to this page
Your browser does not support the video tag.