Laserfiche WebLink
Response to Written Comments Page 8 of 9 07 June 2023 <br /> Forward Landfill, Inc. <br /> COMMENT NO. 20: (WDR Finding 50, Pg 17). RWQCB advised during WMU FU-19 <br /> design to not include suction cup lysimeters under the sump and to just include the pan <br /> lysimeter. Therefore WMU FU-19 does not have suction cup lysimeters and they <br /> are not planned to be installed in future WMUs. <br /> RESPONSE: Language for Finding 50 has been updated to discuss the <br /> discontinued use of suction lysimeters. <br /> COMMENT NO. 21: (WDR Table 4, Pg 17-18). Last 2 rows list Forward as Monitored <br /> Unit. Should it be Austin? <br /> RESPONSE: The monitoring unit will now be referred to as "Forward" since the <br /> addition of WMU FU-19 connects old Forward and old Austin Road together. <br /> COMMENT NO. 22: (WDR Finding 55-70, Pg 19-22). Please add the following item <br /> after Finding 70. "The discharger has worked with and is continuing to work with the <br /> RWQCB to resolve the above listed NOVs and enforcement orders." <br /> RESPONSE: The administrative record includes documentation for resolving the <br /> various NOVs that have been issued. This comment does not need to be <br /> included in the WDRs. <br /> COMMENT NO. 23: (WDR Finding 73, Pg 22). Please clarify how soil-pore liquid data is <br /> to be obtained and tested if base of WMU is not in capillary zone? <br /> RESPONSE: Reference Title 27 Section 20415 for additional information. A <br /> monitoring system shall comply with the provisions set in Title 27. Unsaturated <br /> zone monitoring is required at all new Units unless the discharger demonstrates <br /> to the satisfaction of the RWQCB that there is no unsaturated zone monitoring <br /> device or method designed to operate under the subsurface conditions existent <br /> at that Unit. <br /> COMMENT NO. 24: (WDR Finding 76, Pg 22). Should the reference be to Finding 74? <br /> RESPONSE: Updated to correct reference. <br /> COMMENT NO. 25: (WDR Finding 82, Pg 23). Intermediate liner is also included on <br /> WMUs D-94, D-97, D-98, D-99, and D-00. <br /> RESPONSE: The additional WMUs have been added to Finding 83. <br /> COMMENT NO. 26: (WDR Finding 96, Pg 26). Reference should be to Table 6 <br /> RESPONSE: Updated to correct reference. <br />