My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response to Written Comments Page 10 of 10 07 June 2023 <br /> Forward Landfill, Inc. <br /> RESPONSE: Attachment E, Table 3 header has been updated. Sump foundation <br /> layer has been updated. <br /> COMMENT NO. 35: (Requirements B.6, Pg 35). Table should be titled sump and pan <br /> lysimeter; sump foundation layer should be 6-inch compacted soil <br /> RESPONSE: This note applies to Table 3, not Table 4. See response to <br /> comment for item 31. <br /> COMMENT NO. 36: (Requirements B.6, Pg 35). Area south of NE expansion is Phase 2 <br /> and not Phase 3 <br /> RESPONSE: The area south of Phase 1 will now be considered Phase 2. <br /> COMMENT NO. 37: (Requirements B.6, Pg 35). Tentative WDR does not clarify if <br /> reporting via a separate report or if it will be part of the Quarterly Water Quality <br /> Monitoring Report? VOCs only? <br /> RESPONSE: The Residential Domestic Wells shall follow the current reporting <br /> guidelines found in the Domestic Well Sampling and Analysis Plan (SAP) that <br /> was submitted on May 25, 2017. The SAP was submitted in accordance with <br /> Task 1.b of CAO R5-2017-0703. <br /> COMMENT NO. 38: (Requirements B.6, Pg 35). Austin Unit and Forward Unit no longer <br /> separated out? <br /> RESPONSE: Forward will now be referred to as one unit since the addition of <br /> WMU FU-19 connected old Forward and old Austin Road together. <br /> COMMENT NO. 39: (Requirements B.6, Pg 35). AMW-24R Missing; Water-bearing <br /> zones correct? <br /> RESPONSE: AMW-24R added to Table 1. Water bearing zones updated. <br /> COMMENT NO. 40: (Requirements B.6, Pg 35). Last 2 rows list Forward as Monitored <br /> Unit. Should be Austin? <br /> RESPONSE: Forward Landfill will be considered as one unit. <br /> COMMENT NO. 41: (Requirements B.6, Pg 35). Concentration Limits recalculated <br /> 4Q2021; if required every 2 years, do we start in 2023? <br /> RESPONSE: Yes, since concentration limits were recalculated in 4Q2021 then <br /> the next round of updated concentration limits should be submitted in 2023. <br />
The URL can be used to link to this page
Your browser does not support the video tag.