Laserfiche WebLink
CaIEEMod Version: CalEEMod.2020.4.0 Page 10 of 36 Date: 6/12/2023 11:26 AM <br /> Griffith Energy Storage Project- San Joaquin County, Annual <br /> EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br /> 2 ;Energy Storage Enclosure and ;Building Construction '4/25/2024 ;1/1/2025 5' 180' <br /> Substation Installation <br /> =------------------------+---- ----------------t------------t------------t--------t--------t------------------------- <br /> 3 -Gen-Tie Line Foundation and +Building Construction 10/10/2024 11/20/2024 51 30i <br /> Tower Erection <br /> ---..--F------------------------ -----------------------i------------i-------------I--------4--------+------------------------- <br /> 4 •Gen-Tie Line Pulling and Stringing,'Building Construction !11/21/2024 1/1/2025 5 30: <br /> + i i , , <br /> 5 •Testing and Commissioning :Building Construction -1/2/2025 '3/26/2025 5' 60' <br /> Acres of Grading (Site Preparation Phase): 0 <br /> Acres of Grading (Grading Phase): 160 <br /> Acres of Paving: 0 <br /> Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural <br /> Coating—sgft) <br /> OffRoad Equipment <br /> Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor <br /> Site and Substation Preparation and 'Air Compressors 4; 8.00' 781 0.48 <br /> Grading + ; <br /> - ----------------------- --------------------------I- <br /> Site and Substation Preparation and 'Dumpers/Tenders ; 8; 8.00, 161 0.38 <br /> Grading <br /> + <br /> -------------------------- ----------------=------------ <br /> i----------------------------- <br /> Site <br /> ------------+----- ----- -- <br /> Site and Substation Preparation and 'Generator Sets 2; 24.00' 841 0.74 <br /> Grading ; <br /> + <br /> ------------------------- --------------------------------------------------------- <br /> Site and Substation Preparation and 'Generator Sets ; 2; 8.00, 841 0.74 <br /> Grading + <br /> ----------------------------il�--------------------------i----------------'------------i-------------+-------------- <br /> Site and Substation Preparation and 'Graders 2; 8.00' 1871 0.41 <br /> , <br /> Grading + <br /> -------------------------- ----------------=------------ <br /> i----------------------------- <br /> Site <br /> ------------+----- ----- -- <br /> Site and Substation Preparation and 'Off-Highway Trucks 8; 8.00' 4021 0.38 <br /> Grading + ; <br /> ------------------------- ----------------------------------------- -------------4-------------- <br /> Site <br /> -------------------------t'-------------- = -------------4-------------- <br /> Site and Substation Preparation and +Rollers ; 2; 8.00, 801 0.38 <br /> Grading + <br /> - -----------------------il�--------------------------I- ' <br /> Site and Substation Preparation and 'Rubber Tired Dozers ; 2; 8.00, 2471 0.40 <br /> Grading 1 <br /> + <br /> -------------------------- ----------------=------------ <br /> i----------------------------- <br /> Site <br /> ------------+----- ----- -- <br /> Site and Substation Preparation and 'Rubber Tired Loaders 2; 8.00' 2031 0.36 <br /> Grading + ; <br /> ------------------------- --------------------------------------------=------------ <br /> Site and Substation Preparation and 'Skid Steer Loaders ; 4; 8.00, 651 0.37 <br /> Grading + ; <br /> - -----------------------i-------------------------- <br /> Site and Substation Preparation and +Tractors/Loaders/Backhoes ; 2; 8.00, 971 0.37 <br /> Grading + <br /> ---- ---- ---- ---- ---- --------------------------*-----------------�------------+---- ---- -+------------- <br /> Site and Substation Preparation and -Trenchers 2' 8.00' 78' 0.50 <br /> Grading <br />