My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaIEEMod Version: CalEEMod.2020.4.0 Page 11 of 36 Date: 6/12/2023 11:26 AM <br /> Griffith Energy Storage Project- San Joaquin County, Annual <br /> EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br /> Energy Storage Enclosure and ;Air Compressors 4 8.00' 78' 0.48 <br /> Substation Installation <br /> ----------------------------F--------------------------i----------------------------- . <br /> Energy Storage Enclosure and 'Cranes ; 2; 8.00, 2311 0.29 <br /> Substation Installation a I <br /> --------------------------11�------------------ -------- --------------- -=------------ <br /> Energy Storage Enclosure and +Excavators 4; 8.00' 1581 0.38 <br /> Substation Installation ; I <br /> - <br /> --------------------------- ------------------- --------i--------------- -=------------i-------------4-------------- <br /> Energy Storage Enclosure and 'Forklifts ; 2; 8.00, 891 0.20 <br /> Substation Installation + I <br /> - - - -------------11�-------------------------- ----------------=- <br /> Energy Storage Enclosure and 'Generator Sets ; 4; 8.00, 841 0.74 <br /> Substation Installation a i <br /> ------------------------11�------------------ -------- --------------- -=------------ <br /> Energy Storage Enclosure and +Plate Compactors 2; 8.00' 81 0.43 <br /> Substation Installation ; I <br /> -------------------------------------------------------r----------------=------------i-------------4-------------- <br /> Energy Storage Enclosure and 'Rollers ; 2; 8.00; 801 0.38 <br /> Substation Installation + I <br /> - - - - -------------11�------------------ ' <br /> Energy Storage Enclosure and +Tractors/Loaders/Backhoes ; 6; 8.00, 971 0.37 <br /> Substation Installation a i <br /> ------------------------11�------------------ -------- --------------- -=------------ <br /> Gen-Tie Line Foundation and Tower +Air Compressors 2; 8.00' 781 0.48 <br /> Erection + I <br /> ----------------------------1---------------------------;----------------=------------i-------------4-------------- <br /> Gen-Tie Line Foundation and Tower 'Cranes ; 2; 8.00; 2311 0.29 <br /> Erection + 1 <br /> , <br /> -------------------- 11�-------------------------- ----------------------------- -------------+-------------- <br /> Gen-Tie Line Foundation and Tower 'Forklifts ; 2; 8.00, 891 0.20 <br /> Erection + ---------------------- -- 1 <br /> Gen-Tie Line Foundation and Tower +Generator Sets 2; 8.00' 841 0.74 <br /> Erection + I <br /> -------------------------- 1 <br /> Line Foundation and Tower +Pumps ; 2; 8.00; 841 0.74 <br /> Erection + 1 <br /> , <br /> -----------------------11�-------------------------- ----------------------------- -------------+-------------- <br /> Gen-Tie Line Foundation and Tower 'Welders 2; 8.00' 461 0.45 <br /> , <br /> , <br /> Erection + I <br /> ----------------------------11�-------------------------- ----------------T------------a-------------4-------------- <br /> Gen-Tie Line Pulling and Stringing +Forklifts ; 2; 8.001 89' 0.20 <br /> ------------------------------------------------------- ---------------------------------- ----------------------------------------- <br /> Gen-Tie Line Pulling and Stringing +Generator Sets ; 2; 8.001 84' 0.74 <br /> ------------------------------------------------------- -------------- <br /> Gen-Tie Line Pulling and Stringing +Tractors/Loaders/Backhoes ; 2; 8.001 97' 0.37 <br /> -------------------------------------------------------*----------------- ------------ -------------- ------------- <br /> Testing and Commissioning -Off-Highway Trucks 3' 8.00' 402' 0.38 <br /> Trips and VMT <br /> Phase Name Offroad Equipment Worker Trip Vendor Trip Hauling Trip Worker Trip Vendor Trip Hauling Trip Worker Vehicle Vendor Hauling <br /> Count Number Number Number Length Length Length Class Vehicle Class Vehicle Class <br /> Site and Substation + 38; 40.00 4.001 3,680.00 16.80: 6.60; 20.00:LD_Mix I HHDT I HHDT <br /> --- ---- ---- ------------------------------------i------------------------------------------------------------------'---------- <br /> --- ---- <br /> Energy Storage + 26; 120.00 20.001 3,600.00i 16.80 6.60; 20.00;LD_Mix IHHDT IHHDT <br /> '__ '_ ' <br /> ................ <br /> --------------r----------}----------I r---------}--....--.. .-------------- ....... ........--------------- -------- <br /> Gen-Tie Line 14' 40.00' 4.00' 600.00' 16.80' 6.60' 20.00 LD Mix HHDT rHHDT <br /> Cni inrJ.�+inn.�nrJ Ti.�nior' <br />
The URL can be used to link to this page
Your browser does not support the video tag.