Laserfiche WebLink
CaIEEMod Version: CaIEEMod.2020.4.0 Page 8 of 30 Date: 6/12/2023 11:35 AM <br /> Griffith Energy Storage Project-San Joaquin County, Summer <br /> EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br /> 2.2 Overall Operational <br /> Mitigated Operational <br /> ROG I NOx I CO I SO2 I Fugitive Exhaust I PM10 I Fugitive Exhaust PM2.5 Bio-CO2 NBio-CO2 Total CO2 CH4 I N20 CO2e <br /> PM10 PM10 Total PM2.5 PM2.5 Total <br /> Category Ib/day Ib/day <br /> Area •i 0.0123 i 1.2100e- 0.1331 i 1.0000e- 4.7000e- i 4.7000e- 4.7000e- 4.7000e- 0.2860 0.2860 i 7.4000e- 0.3046 <br /> •� 003 005 004 004 004 004 004 i <br /> Energy •1 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 <br /> Mobile •i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 � 0.0000 0.0000 <br /> Offroad •i 1.4327 i 8.5982 9.5564 i 0.0397 i 0.3073 i 0.3073 i 0.2827 0.2827 0.0000 i 3,839.026 3,839.026 i 1.2416 J :3,870.066 <br /> 3 i 3 i i 8 <br /> Total 1.4450 8.5994 9.6895 0.0397 0.0000 0.3078 0.3078 0.0000 0.2832 0.2832 0.0000 3,839.312 3,839.312 1.2424 0.0000 3,870.371 <br /> 3 3 4 <br /> ROG NOx c0 SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio-0O2 NBio-CO2 Total CO2 CH4 N20 CO2e <br /> PM10 PM10 Total PM2.5 PM2.5 Total <br /> Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Reduction <br /> 3.0 Construction Detail <br /> Construction Phase <br /> Phase Phase Name Phase Type Start Date End Date Num Days Num Days Phase Description <br /> Number Week <br /> 1 Site and Substation Preparation +Grading 1/1/2024 4/19/2024 5i 80: <br /> :and Grading <br /> - <br /> ------F------------------------ ----------------------- ---- ----- +------------------------- <br /> 2 -Energy Storage Enclosure and 'Building Construction 14/25/2024 1/1/2025 51 1801 <br /> Substation Installation <br /> +------------------------- <br /> 3 !Gen-Tie-Line Foundation and 'Building Construction 110/10/2024 111/20/2024 1 51 30 i <br /> :Tower Erection <br /> + <br /> F----- ---- -- ----------------------+------------+------------+--------+--------+ <br /> 4 -Gen-Tie Line Pulling and Stringing:Building Construction 11/21/2024 -1/1/2025 5, 30, <br />