Laserfiche WebLink
CaIEEMod Version: CaIEEMod.2020.4.0 Page 9 of 30 Date: 6/12/2023 11:35 AM <br /> Griffith Energy Storage Project-San Joaquin County, Summer <br /> EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br /> 5 ;Testing and Commissioning ;Building Construction ;1/2/2025 '3/26/2025 5' 60' <br /> Acres of Grading (Site Preparation Phase): 0 <br /> Acres of Grading (Grading Phase): 160 <br /> Acres of Paving: 0 <br /> Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural <br /> Coating—sgft) <br /> OffRoad Equipment <br /> Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor <br /> Site and Substation Preparation and 'Air Compressors 4; 8.00' 781 0.48 <br /> Grading + I <br /> -------------------------i�--------------------------------------------=------------ <br /> Site and Substation Preparation and 'Dumpers/Tenders 8; 8.00' 161 0.38 <br /> Grading ; I <br /> + <br /> -------------------------i------------------- --------------------------- <br /> Site and Substation Preparation and 'Generator Sets ; 2; 24.00, 841 0.74 <br /> Grading + ; <br /> - -----------------------i�-------------------------- ----------------=- <br /> Site and Substation Preparation and 'Generator Sets 2; 8.00, 841 0.74 <br /> Grading <br /> + <br /> -------------------------- ----------------=------------ <br /> i----------------------------- <br /> Site <br /> ------------+----- ----- -- <br /> Site and Substation Preparation and 'Graders 2; 8.00' 1871 0.41 <br /> Grading ; I <br /> + <br /> ------------------------- --------------------------------------------------------- <br /> Site and Substation Preparation and 'Off-Highway Trucks ; 8; 8.00, 4021 0.38 <br /> Grading + 1 <br /> ----------------------------i�--------------------------i----------------'------------i-------------+-------------- <br /> Site and Substation Preparation and 'Rollers 2; 8.00, 801 0.38 <br /> Grading I <br /> + <br /> -------------------------- ----------------=------------ <br /> i----------------------------- <br /> Site <br /> ------------+----- ----- -- <br /> Site and Substation Preparation and 'Rubber Tired Dozers 2; 8.00' 2471 0.40 <br /> Grading + I <br /> ------------------------- --------------------------------------------=------------ <br /> Site and Substation Preparation and 'Rubber Tired Loaders 2; 8.00, 2031 0.36 <br /> Grading + <br /> ----------------------------i�--------------------------I- ' <br /> Site and Substation Preparation and 'Skid Steer Loaders 4; 8.00' 651 0.37 <br /> Grading I <br /> + <br /> -------------------------------------------=------------ <br /> i----------------------------- <br /> Site <br /> ------------+----- ----- -- <br /> Site and Substation Preparation and +Tractors/Loaders/Backhoes 2; 8.00' 971 0.37 <br /> GradingI <br /> + <br /> ------------------------- --------------------------------------------------------- <br /> Site and Substation Preparation and 'Trenchers ; 2; 8.00, 781 0.50 <br /> Grading + <br /> - -----------------------i�------------------------- ' <br /> Energy Storage Enclosure and 'Air Compressors 4; 8.00, 781 0.48 <br /> Substation Installation + i <br /> - <br /> ---------------------------i�-------------------------- ----------------=------------ -------------4-------------- <br /> Energy Storage Enclosure and 'Cranes 2; 8.00' 2311 0.29 <br /> Substation Installation a I <br /> ---------------------------- ---------------------------*---------------- ------------+----------------------4------------- <br /> Energy Storage Enclosure and •Excavators 4. 8.00' 158' 0.38 <br /> Substation Installation <br />