My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaIEEMod Version: CaIEEMod.2020.4.0 Page 10 of 30 Date: 6/12/2023 11:35 AM <br /> Griffith Energy Storage Project-San Joaquin County, Summer <br /> EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br /> Energy Storage Enclosure and •Forklifts 2 8.00' 89' 0.20 <br /> Substation Installation <br /> ---------------------------• --------------- ---------------------------- <br /> Energy Storage Enclosure and 'Generator Sets ; 4: 8.00, 841 0.74 <br /> Substation Installation : I <br /> ----------------------------i--------------------------- ----------------=------------ <br /> Energy Storage Enclosure and +Plate Compactors 2: 8.00, 81 0.43 <br /> Substation Installation : ; I <br /> ----------------------------i---------------------------i--------------- -=------------i-------------4-------------- <br /> Energy Storage Enclosure and 'Rollers ; 2: 8.00, 801 0.38 <br /> Substation Installation + I <br /> - - - -------------i------------------- ' <br /> Energy Storage Enclosure and +Tractors/Loaders/Backhoes ; 6: 8.00, 971 0.37 <br /> Substation Installation : i <br /> ----------------------------i--------------------------- ----------------=------------ -------------4-------------- <br /> Gen-Tie Line Foundation and Tower +Air Compressors 2; 8.00, 781 0.48 <br /> Erection + I <br /> - <br /> ---------------------------i---------------------------;----------------=------------i-------------4-------------- <br /> Gen-Tie Line Foundation and Tower 'Cranes ; 2; 8.00; 2311 0.29 <br /> Erection + ----------------- <br /> Gen-Tie Line Foundation and Tower 'Forklifts ; 2; 8.00, 891 0.20 <br /> Erection + ' <br /> ------------------------i--------------------------- ----------------=------------ <br /> Gen-Tie Line Foundation and Tower +Generator Sets 2; 8.00, 841 0.74 <br /> Erection + I <br /> -------------------------- i <br /> Line Foundation and Tower +Pumps ; 2: 8.00; 841 0.74 <br /> Erection + 1 <br /> ----------------------------i---------------------------i----------------'------------i-------------4-------------- <br /> Gen-Tie Line Foundation and Tower 'Welders 2; 8.00, 461 0.45 <br /> Erection + i <br /> ----------------------------i--------------------------------------------T------------a-------------4-------------- <br /> Gen-Tie Line Pulling and Stringing 'Forklifts : 2; 8.001 89' 0.20 <br /> ---------------------------- -------------------------- -----------------------------------------------+---------------------------- <br /> Gen-Tie Line Pulling and Stringing 'Generator Sets : 2; 8.001 84' 0.74 <br /> ------------------------------------------------------- -------------- <br /> Gen-Tie Line Pulling and Stringing +Tractors/Loaders/Backhoes : 2; 8.001 97' 0.37 <br /> -------------------------------------------------------*----------------- ------------ --------------F------------- <br /> Testing and Commissioning -Off-Highway Trucks 3' 8.00' 402' 0.38 <br /> Trips and VMT <br /> Phase Name Offroad Equipment Worker Trip Vendor Trip Hauling Trip Worker Trip Vendor Trip Hauling Trip Worker Vehicle Vendor Hauling <br /> Count Number Number Number Length Length Length Class Vehicle Class Vehicle Class <br /> Site and Substation + 38: 40.00 4.001 3,680.00: 16.80: 6.60; 20.00:LD_Mix (HHDT I HHDT <br /> --- ---- ---- �-------------------- ------ i---------- --------- -------------------------------------------- '----------�-- ---- <br /> Energy Storage + 26: 120.00 20.001 3,600.00; 16.80: 6.60; 20.00;LID—Mix I HHDT I HHDT <br /> --- --o-+C-. <br /> ------- ---- ------------------- <br /> 4 - <br /> Gen-Tie Line + 14: 40.00 4.001 600.00: 16.80: 6.60; 20.00,LID—Mix I HHDT I HHDT <br /> --- ---- ---- ------------ <br /> ------- --- --------------------- <br /> Gen-Tie <br /> ------------ ----Gen-Tie Line Pulling + 7; 49.00 4.001 600.00: 16.80: 6.60; 20.00,LID Mix I HHDT I HHDT <br /> ----------------•--------------T---------------------r--------- ----------- --------------- ------' ------------+—————————— -------- <br /> Testing and 3' 100.00 0.00 0.00 16.80' 6.60' 20.007LD_Mix HHDT rHHDT <br /> r„ <br /> 3.1 Mitigation Measures Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.