My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Biological Resources Evaluation Report <br /> Griffith Energy Project <br /> Table 7.Additional Recommended Surveys <br /> Species Recommendation Survey Schedule <br /> Plants <br /> Big tarplant Rare plant survey July-November <br /> Caper-fruited tro idocar um Rare plant survey March-April <br /> Amphibians <br /> California tiger salamander Assume presence andmitigate Protocol surveys are not required if presence is assumed. <br /> Birds <br /> Nesting season surveys: February 15-July 15 <br /> Burrowing owl Pre-construction survey Winter season survey: December 1-January 31 <br /> Pre-construction survey: conduct within 14 days prior to the <br /> beginning round and/or vegetation disturbing activities <br /> Additional Requirements <br /> California red-legged frog Pre-construction survey Pre-construction survey: conduct no more than 7 days prior <br /> to construction activities. <br /> Pre-construction survey: conduct no more than 10 days prior <br /> Swainson's hawk Pre-construction survey to construction activities that occur between March 1 to <br /> September 15. <br /> Pre-construction survey: conduct no more than 10 days prior <br /> Nesting birds(including raptors) Pre-construction survey to construction activities that occur between February 1 to <br /> September 15. <br /> San Joaquin kit fox/American Pre-construction survey Pre-construction survey: conduct 14-30 days prior to <br /> Badger beginning round and/or vegetation disturbing activities. <br /> California glossy snake, San Will be addressed by general wildlife pre-construction <br /> Joaquin coachwhi Minimization measures surveys/measures that are developed in the CEQA document. <br /> Tetra Tech, Inc 6-4 July 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.