My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
4600
>
1600 - Food Program
>
PR0548605
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 11:31:43 AM
Creation date
9/5/2023 11:24:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0548605
PE
1617
FACILITY_ID
FA0027795
FACILITY_NAME
VALLEY FUELS INC
STREET_NUMBER
4600
Direction
S
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
4600 S CORRAL HOLLOW RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 AnthonyModel 401 & 403 Pass-Thru <br /> Service and Installation Instructions <br /> •�. 99-21972-S001 Rev. A <br /> Remove Existing Lighting System <br /> 1. Remove the following items.- <br /> a. <br /> tems:a. Lens <br /> b. Fluorescent lamps <br /> c. Lamp holder <br /> d. Mounting clips <br /> e. Ballasts from existing lighting system <br /> NOTE: Refer to case manufacturer's instructions for any questions <br /> on removing the fluorescent system and ballast. <br /> 2. Seal any open holes on Mullion using neutral cure silicone sealant (not <br /> provided). <br /> 3. Make sure you save the two #8 tapping screws used to hold the ballast in <br /> place. <br /> Mounting the LED Power Supplies <br /> 1. Install the LED power supply in the same location where the ballast was fitted <br /> or in the general location for ease of wire connection. <br /> 2. Mount the LED power supply using two #8 tapping screws saved when the <br /> ballast was removed <br /> NOTE: Installer may have to drill two holes in raceway to <br /> accommodate LED power supply if the door is not an Anthony <br /> model. <br /> NOTE: The LED power supply case is grounded. Attach the LED <br /> power supply to a ground point in the refrigerated directly with <br /> a screw. <br /> 3. Reinstall raceway cover(s). <br /> Locate, Drill and Mount the LED Fixture to the Mullion <br /> Prior to drilling, make sure there are no existing components inside the mullion in the <br /> areas marked off for the designated holes. <br /> NOTE: Drilling is not required for an Anthony model frame. Pre- <br /> existing holes are used. <br /> 1. Using a ruler, measure the total width of the mullion at (A) and (B), and mark <br /> a vertical line half the total width near the top and bottom of the mullion, as <br /> shown in the following illustration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.