Laserfiche WebLink
Model 401 & 403 Pass-Thru <br /> O Anthony® Service and Installation Instructions <br /> .�Cmwwn 99-21972-SO01 Rev. A <br /> A--� <br /> Wdial <br /> WWI- <br /> Center Line <br /> 2. Mark a vertical line from the top of the Mullion to the bottom of the Mullion <br /> through the lines measured in step 1. <br /> 3. Divide the vertical line distance in half and mark as a Center Line. <br /> 4. Position the center punch directly over at the intersection of the horizontal line <br /> and the vertical line (top, center and bottom) and establish a dimple. <br /> 5. Use a power drill and (1/8") 0.125" dia. drill bit. Drill (1) hole at the intersection <br /> of the vertical center line and the horizontal lines. <br /> 6. Refer to the "Wiring Diagrams and Orientation" section. <br /> a. If the electrical wires are at the top of LED Fixture, go to step 6e. If the <br /> electrical wires are at the bottom of the LED fixture go to step 6b. <br /> b. Place the extrusion notch toward the bottom of the Mullion. <br /> Plastic <br /> Shield <br /> _ Vertical <br /> Mullion <br /> c. Using a Phillips screw driver, thread a #8 tapping screw through the plastic <br /> extrusion. <br /> Plastic <br /> Shield <br /> m ' Vertical Mullion <br /> at CIL <br />