My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
4600
>
1600 - Food Program
>
PR0548605
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 11:31:43 AM
Creation date
9/5/2023 11:24:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0548605
PE
1617
FACILITY_ID
FA0027795
FACILITY_NAME
VALLEY FUELS INC
STREET_NUMBER
4600
Direction
S
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
4600 S CORRAL HOLLOW RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Model 401 & 403 Pass-Thru <br /> 0 Anthony" Service and Installation Instructions <br /> A�.Commw 99-21972-S001 Rev. A <br /> NOTE: The LED power supply case is grounded. Attach the LED power <br /> supply to a ground point directly with a screw. <br /> 5. Reinstall raceway cover(s). <br /> 6. Seal any open holes on Mullion using neutral cure silicone sealant (not <br /> provided). <br /> Locate, Drill and Mount the LED Fixture to the Mullion <br /> ' WARNING: Prior to drilling, ensure there are no components inside the <br /> mullion in areas marked off for the designated holes. <br /> NOTE: The LED power supply case is grounded. Use a screw to attach <br /> the LED power supply to a ground point. <br /> 1. Measure the total width of the mullion at (A) and (B), and mark a vertical <br /> line half the total width near the top and bottom of the mullion, as shown in <br /> the following illustration. Mount the LED power supply using two #8 tapping <br /> screws. <br /> F--A� <br /> Vertical <br /> Mullion <br /> Center Line <br /> 2. Mark a vertical line from the top of the Mullion to the bottom of the Mullion <br /> through the lines measured in step 1. <br /> 3. Divide the vertical line distance in half and mark as a Center Line. <br /> 4. Position the center punch directly over at the intersection of the horizontal <br /> line and the vertical line (top, center and bottom) and establish a dimple. <br /> 5. Use a power drill and (1/8") 0.125" dia. drill bit. Drill one (1) hole at the <br /> intersection of the vertical center line and the horizontal lines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.