GENERAL NOTES cuENT:
<br /> H:Al11KN SPECIFICATIONS AND COMPATIBLE FLUIDS REQUIREMENTS PIPING LEGEND ��
<br /> POTENTIAL UTILITY CONFLICT, CONTPACOR SULL RDD VE6FY Moto EXISTING AND THE TABLE BELOW USES VE DER—ROOT UNE LEAN( DETECTOR SPEORCATIONS
<br /> A NEW VIIHDFS RNDH TO CONSTRUCTION. SEE U NRY Crcn NE EXISTING —• —• —• —• —• —• — FIHAGLASS PRODUCT PIPNG (REGULAR)
<br /> TARTER SIGN, MD S'ANTMG! SEWTR SERVICE SoOIfN R IPPIDXIMIE. BASED OI _. _. _. _. _, —, —, _,_
<br /> FEND SURVEYS AND 1S 1111E' RECDRJS. RE GBFAIL ONRVLEdN SIWL FIBERGLASS PRODUCT PIPING (PREMIUM)
<br /> 'POTHOLE' TIE EASING UTIRES TO AN" TIE LXMIETER AND LOCATION ONCL SPECIFICATION —25 TO 13DF —. —. —. —. —. —. —. —. — )
<br /> FIBFAGL,LSS PRODUCT PIPING (OIESZL
<br /> EILYATKNS) PROM TO CIXRERUCIIGN. ANY OBCIESVNgES N 140E LOCARW OF —.—.—.—.—�.— FIBERGLASS VAPOR RECOVERY PIPING
<br /> THE EOTNG PPE OR INr/JYPAREUTY OF ME DERGH SHALL 9DUOR TG THE COMPATIBLE MELS LECALCINE
<br /> O , 'NNMNDYT AREXTW OF EINE CE11ER9 RFPIBSFNWIIr� MD OWNERS CTRL LEADED ADED GASOLINE —•— _- -- _- -- -- _— FIBERGLASS VENT PIPING
<br /> ENGINEER, — FIBERGLASS CROSSOVER VACUUM PIPING
<br /> 3x YETHARCL/ 93f{ UNLEADED ETRARd.
<br /> 0-100
<br /> es 1277 West March WTI., 103 ETHAA NOL/ BNL UNLEADED
<br /> LIMY CONS 1LT NOi6 103MME/ 9511E UNLEADED INSTAIATION NOTES:
<br /> DIESEL
<br /> Pj'!a UluH / CAMON SIODIESL (UP TO BIDO) PP
<br /> IS PERMITTED
<br /> ASSUMES T PIPING
<br /> SI LOCA TO ASSURE THAT THE . FKLD C SYSTEM MEETS 740E DESIGN INTENT AND THE CONTRACTOR
<br /> KEROSINE IS PERYITID 1D NTJUST PIPING LOCATIONS BASED ON ACTUAL. FIELD CONDITIONS 1N0 INSTALIAT(IN TECHNIQUES,
<br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION. ,ET NEL • PRODUCT, VAPOR AND VENT PIPING 15 TO SLOPE TOWARD TANK 1 /11' PER FOOT MINIMUM, I/4' PER FOOT PREFERRED. IF
<br /> 8 B DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON AMA11ON GASOLINE
<br /> THESE PLANS OR NOT BY POT HOLING THE UTAITIES AND SURVEYING THE INSTILLED, SPHOI PIPING 1D ROPE IAC PER FOOT.
<br /> a HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL SC NOT GRAPHICALLY. ALL PRODUCT PIPING TO BE DOUBLE CONTAINMENT
<br /> INCLUDE CALLING UTIUTY LOCATE O 1 (1100) 227-2800 AND THEN POT UNE NOW RATE 120 CPY MAX.YAKW/ SNFTOECKVALVE RPE VEN M C BE
<br /> HOLING ALL OF THE CASTING UTILITIES AT LOCATIONS OF NEW UTILITY
<br /> OPERATING RANGE O-7OPS 5
<br /> LOCATIONS
<br /> TO PHYSICALLY S AS OW NON OR NOT LAN ARE EXIST, PROOF PRESSURE 200 PS OO MONITOR
<br /> DOUBLE WALL FIBERGLASS TANKS WITH SHALL BE MONITORING OF TINUO SLY ANNULAR SPACES BY ffVMERoot ROOT' TANK AND PIPING
<br /> v LOCATIONS OP SAID UTI INFO AS ION AN ON THESE PLANS ARE BASED UPON MONITOR ANO MONO OR SYSTEM.
<br /> I. ALL TANK SUMPS STAIR BE 0 BELE FIN CONTINUOUSLY MONITORED BY 'VEDER ROOT UQUIO NCESENSORS
<br /> WT TIED INTO THE "
<br /> 140E UNVERIFIED SHOULD
<br /> PUBLIC INFORMATION AND ARE HALLSUBLECT TOT THE OW IF MAK NE HO it FEET TANK A PIPING MONITOR STION I TANKS TO BE SET MIN, IO' BELOW FINISH GRADE. TANK INSTALLATION SHALL BE IN ACCORDANCE WTH
<br /> CO L ENGINEER
<br /> SHOUD OCCUR, THE CONTRACTOR OB SHALL CONSULT THE NTH PIPELINE ANWU MANUFACTURER'S INSTALLATION INSTRUCTIONS
<br /> qNL ENgNEER TU RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING NTH ABOVE TRARSOICFAP
<br /> CONSTRUCTION. MINIMUM PUMP 23 PBI ARCO
<br /> VICINITY MAP OUTPUT PRESSURE ' O INSTALL A CONCRETE SAB OVER TANKS THE MAN INLETS HALL H DIVERTED AWAY FROM EACH 4A, CONE BY T SLAB A CONCRETE CROWN UAI A
<br /> DETAIL AND IN IB' FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAR ELEVATION . CONSTRUCT SLAB PER CIVIL SLAB INSTALLATION
<br /> 20 D 20 40 DETAILS AND SPECIAL REQUINEMERTS SHOW ON DETAILS.
<br /> ' MODIESL ODNPIANT WTH ASTM 07467 (UP TO 820) OR ASTM 06751. CD INSTALL FILL SPILL BUCKET 5 GALLON WITH ADAPTERS AND CAPS, EP WW C0A8T PF DUM LLC
<br /> P CONSULT PUMP MANUFACTURER FOR COMPATIBILITY RATINGS ON NEL BLENDS Q INSTALL VAPOR SPILL BUCKET 5 GALLON NTH ADAPTERS AND CMS NO, GATE DESCRIPTION
<br /> GRAPHIC SCALE GREATER THAN Bea
<br /> „= 2D'-0• ' APPLICATION THAT EXCEEDS THESE MAX VERTICAL PIPELINE HEIGHTS WILL RECKARE Q AALTTEARNATILL NG STARTS ABLE E SPEED
<br /> LOC1AL AGENCYNES IN AS REQUIRED,ERGROUND TURBINE RAGE USYSTEMS TUBE EQUIPPED WITH REQUIRED.RE TURBINES AS GPHH ELECTRONIC LINE LEAKMING
<br /> METE�ON,REQUIREMELEAK I 06/IS/7021 NEW TANK LOCAIICN
<br /> FURTHER CONSULTATION, DETECTORS ARE TO BE TESTED FOR THE 3 CPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF PUNCT �Eoo
<br /> W/10/2011 TME COW TO HW
<br /> GRAPHIC SCALE PUMP OUTPUT PRESSURE SHOULD BE MINIMUM OF 4 PSI ABOVE THE CHECK VALVES UST AS WILL AS INCLUDE IN CLOSE OUT BINDER. SEE TURBINE INTAKES AT 5 FROM BOTTOM OF TANKS, TURBINES TO BE EQUIPPED NTH INTAKE FILTER 08/10/2071 R RA DO anim
<br /> RELIEF PRESSURE SCREENS. CONTRACTOR IS TO LABEL TURBINES AND TR 5 AS TO WHICH PRODUCT THEY SERVE GREEN CONTROLLER LIGHTS ARE TO 00 OUT
<br /> WHEN TURBINES ARE OFF OR LOSE POWER. ;W
<br /> 09/16/7071 IO WNTIegi LOL1101
<br /> 13 14 IS 18 13 1411 1 4 11 15 111 © I A V HEADER FOR VAPOR RECOVERY SYSTEM, SLOPE 1/I' PER FOOT MINIMUM TO TANKS 02/07/2022 NSW PER DO OHN.
<br /> INSTALL�J� TO R UCNC ERE N ADEPS BRANCH TO DISPENSERS, CONTRACTOR TO INSTALL TRAM TAPE WITH VAPOR PIPING, TESTING OF
<br /> 8 1 3 5 5 71 VAPOR ONES SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAYING AND BEFORE STATION OPERATION, SECONDARY CONTAINMENT TO BE
<br /> 1 18 13 4 INSTALLED WHEN REQUIRED BY LOCAL JURISDICTION ONLY, SEE DETAILS AND SCOPE OF WORK ON SHEETS 0.0.2.1 k G.0.2.2 FOR PIPE SDNG AT
<br /> UNDERGROUND STORAGE TANKS,
<br /> 11 I000000'o (D INSTALL 2' INSIDE 3' DOUBLE WALL FIBS FIBERGLASS GASOLINE/ DIESEL SUPPLY LINES TO DISPENSERPIPING SHALL BE INSTALLED PON MANUFACTURER'S
<br /> \ SPODFICAIIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A MINIMUM SLOPE OF 1 /8• PER FOOT FROM THE FURTHEST DISPENSER SUMP DOWN
<br /> 1 . 000 \ TO THE ,TURBINE
<br /> SUMPS. CONTRACTOR TO INSTALL TO PAYING ANO BEFORE STATION TRACER TAPE
<br /> WITH PRODUCT PIPING, TESTI G OF PRODUCT LINES SHALL BE PEWODJED PRIOR TO
<br /> _ N72'0330 n
<br /> 7.1 REFER TO SHEET M.5.3.09 FOR PIPING REQUREYENTS.
<br /> 1 / fl GULITR I I I C INSTALL 'VEEOER ROOT TANK AND UNE ALARM CONTROL P EL IN BUILDING AT NORMALLY OCCUPIED LOCATION IN BUILDINO, SEE ARCHITECTURAL AND
<br /> 2DI( G.M.. rh 6 12 ELECTRICAL DRAWINGS FOR EXACT LOCATION. 3
<br /> 111 O E T FOR EACH UNDERGROUND STORAGE TANK. SLOPE 1 /4' PER FOOT (1 /11' PER FOOT MINIMUM)
<br /> 9 APE NTN VENT PIPING.
<br /> I e ,fir= -- � r= =r r —. J
<br /> i a 2 rr���I, , J 1
<br /> Y 13 w rl• /'C TER Fl IM 10 NEW LENT RISERS AND STRUCTURAL SUPPORT. TERMINATION POINT OF TANK VENTS TO EE A MINIMUM OF 12' ABOVE GRADE AND NOT NTHIN 5'
<br /> 11 FROM ANY BUILDING OPENING OR PROPERTY UNE THAT CAN BE BUILT UPON. KENT RISERS SHALL BE INSTALLED IN ACCORDANCE NTH UNIFORM
<br /> 1111111,11411 i FIRE CODE REQUIREMENTS. VERIFY LOCAL REGULATIONS FOR ADDITIONAL EQUIPMENT OR INSTALLATION REQUIREMENTS.
<br /> g - I 3 10 II 12 SEAL'
<br /> L• 7���'''000 TMP. 7 � Q MSULL A SINGLE I ' TIGIO GALVANIZED CONDUIT FOR EACH NEWLY INSTALLED lUNZ01NE PUMP.
<br /> L� N IL
<br /> 14 �W 1e IM ® 4 N 72 INSTALLMDUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING SENSORS SEE DETAILS FOR CONDUIT LOOPING BETWEEN ANNULAR RISER
<br /> oo`o13 INSTALL. EXTRACTOR ASSEMBLIES FOR VENT, AND STAGE II VAPOR RECOVERY AT TURBINE SDE SUMP, VERIFY NTH LOCAL JURISDICTION FOR
<br /> • 15 w 9 I it 1/V PER FE MX TMP• 9 ' ALTERNATE REWIRED LOCATIONS.
<br /> II 11 L:DQ INSTALL .I RPH MAC PROBE TANK LEVEL GAUGES AT TURBINE SUMPS AS S10WN. 36475
<br /> ¢ Q N0. —30-
<br /> 19 Ih� ���, Q TANKS SMALL BE PROPERLY MARKED AND TAGGED WTIR STANDARD HR IDENTIFICATION MARKINGS AT FILL MARHIXES. XP, B-30so
<br /> —
<br /> 11QI 6,321 SO.FE.
<br /> 1 [aP 16 w > EQU I � 7. 7 19 C IB INSTALL 2' INSIDE 3' DOUBLE WALL FRP CROSSOVER PINE FOR VACUUM. 4' VCIL\
<br /> IA III E50 B 17 INSTALL WAYNE OVATION SERIES, SINGLE HOSE PER ROE, MULTI—PRODUCT DISPENSERS AS SHOWN. DISPENSERS TO BE FITTED NTH STAGE II HOSES,
<br /> A ® NOZZLES AND BREAKAWAY VALVES PER LOCAL REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES, NOZZLES AND BREAKAWAYS
<br /> INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS. START UP BY MANUFACTURER
<br /> •I 0 E ® z REPRESENTATIVE GENERAL CONTRACTOR TO PURGE LINES NTH A MINIMUM O' 200 GALLONS THROUGH EACH HOSE/NOZZLP. ANY AIR POCKETS OR
<br /> I PER LI •• I/11' 14A Fl YK oo'oY START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WRING THAT DESTROYS ELECTRONICS WLL BE BILLED BAC( TO THE
<br /> /{ �} CONTRACTOR. AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS TO REPLACE THE FACTORY
<br /> 1 FT, L/L– INSTALLED GASOLINE FILTERS WRIT NEW FILTERS. w
<br /> 000000 — COMM ID - (P) (P) 7.(ED
<br /> INSTALL WAYNE OVATION SERIES, DUAL HOSE PER SOE, MULTI-PRODUCT DISPENSERS AS SHOWN. DISPENSERS TO BE FITTED WITH STAGE II HOSES Uy N
<br /> STORE ECH CAR WASH NOZZLES AND BREAKAWAY VALVES PER LOCAL REQUIREMENTS, CONTRACTOR IS RESPCNSBLE FOR INSTALLING HOSES, NOZZLES AND BREAKAWAYS l7
<br /> 3.100 SG. 31910 S81F5T INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS START UP BY MANUFACTURER d a
<br /> !F 7. i] 4 REPRESENTATIVE GENERAL CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH EACH HOSE/NOZZLE. ANY AIR POgETS ON Z f w
<br /> 10 i START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WRING THAT DESTROYS ELECTRONICS WILL BE BALED BAC( M THE r -,
<br /> CONTRACTOR. AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS TO REPLACE THE FACTORY z D m
<br /> I INSTALLED GASOLINE FILTERS NTH NEW FILTERS. � O R m n
<br /> I %=. IXN
<br /> (M FILL AND STAGE 1 VAPOR RECOVERY RISERS At ANNULAR RISER SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING OPERATIONS SE ow Q p Ea-P
<br /> w 1/b• RR R YK 19 �(.( OW, C.0.7.2 FOR CALIFORNIA DESIGN WITH DOUBLE WALL SUMPS CI'F,�,\( W W N z >
<br /> ESO LJ 19 INSTALL OVERFILL ALARM k ACKNOWLEDGMENT SWITCH, ESO AND MAINTENANCE RECEPTACLE IN LOCATION SHOWN, ALARM AND SWTCH TO BE LOCATED '�IMI�I'` °W LU O z o
<br /> Z III E8 TO PROVIDE AN UNOBSTRUCTED NEW TO TRUCK DRIVEN, PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE SEE WRING OAGRAI AND DETAIL FOR �IIIIIDTpp, ¢
<br /> !!!ILijr 1 D MOUNTING REQUIREMENTS. I y (� Z CIU d
<br /> 1�I P Q NEW HEALY VMGR PROCESSOR UNIT, CONNECT TO THE NEW GAEDUE VENT RISA Q u z O z 'N
<br /> I r 7 —J171) ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. W w Z
<br /> L Q FINAL FACILITY EQUIPMENT LOCATIONS TO BE APPROVED BY DISTRIBUTION TERMINAL MANAGER PRIOR TO SUBMITTAL FOR PERMITS TO ENSURE CLEAR OU i $
<br /> Q
<br /> AND SAFE ACOS TO THE UNDERGROUND TANKS FOR UNLOADING OPERATIONS. O(1 w
<br /> ' C. 1 IllyyyLLTL�'�rFF 7—�.��R' COD <Z) NEW DISPENSER ISLAND, Q 0 O
<br /> Z I ro PER Ff. COO I © NEW HORSESHOE BO M0 TO PROTECT NEW MPDS. z
<br /> = 64'39'26'W g
<br /> 20.17 ' d GENERAL COMPLIANCE NOTES DEVMWMMT INFORMATION:
<br /> ' I. ARCHITECTURAL AND CVL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES
<br /> W I ELEVATIONS AND EQUIPMENT LOCATIONS
<br /> - - - - - - - - 2, ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY
<br /> a. DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING NTH
<br /> THE WORK.
<br /> 3. GENERAL CONTRACTOR SNL AIOBTAIN NECESSARY PERMIT FROM APPUCABLE AGENCIES FOR EXCAVATIONS OF TRENCHES V-0'
<br /> R=20.00' 200.66 N7Z0.370E N 893.011' OR MORE DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND.
<br /> L=31.63'
<br /> D-90037'30' ' \ 4 AN RAIIGNRCIZEO RELEASE REMORSE PUN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK 511E AGGRESS
<br /> T=20.22• OPERATIONS
<br /> S ALL DASHALL BE COMPATIBLE NTH USE FOR THE INTENDED PURPOSE AS AS PER NATIONALLY RECOGNIZED CODES, LOCAL
<br /> CODES AND GOO GOVIIWING AUTHORITIES. 1111IHTYMgIUIE
<br /> 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. 1110CITTICK CA
<br /> ® �,Q BO6\ � I NEIN COUNTY
<br /> 's®1 AL 1 IT® 7, ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS,
<br /> SAN N A V C UN i Y & GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK
<br /> ,ENVIRONMENTAL HEALTH DEPARTMENT. ITANK MANDPIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR A GOVERNING AGENCY AT FOUR (4) GERM 811%
<br /> 1868 E. WELTON AVE. SA TANK AIR TESTI BEFORE EPARATE CONSTRUCTION "SETTINASES GS N HEE OE AND SSOOAAPP TEST. ORO BY: ER
<br /> B. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES
<br /> STOCiCTON , CA 95205
<br /> C. INSPECTION OF ALL SECONDARY CONTAINMENT. INCLUDING "TING, IN ACCORDANCE WIN DATE PILO.ECT NR
<br /> 1 •209 - �0 MANUFACTURER'S INCLUDNES. 09)12)2021 7161/\ 0, FINAL INSPECTION INCLUDING ALL PORTIONS CK THE LEAK DETECTION SYSTEM.
<br /> 10 ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) NTH DRAWING TITLE.
<br /> 1 , N� , A , STANDING WATER TO TOP O" REDUCING COLLAR FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT.
<br /> rovGlY %! "r' RECORD THE TEST RESULTS AND SUBMIT TO OYNER.
<br /> .'!+R PRF? , : .0''.AF UNDERGROUND TANK AND PIPING
<br /> pp 11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SY57EM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING SITE PIAN
<br /> PRIORY PRIOR TO
<br /> BE TANK SYSTEM BONG PLACED IN OPERATION.
<br /> Approved with . changes: See Remarks 12 PRIOR TO NBEING NG PUMPED, STATION MUST HAVE VEDER ROOT FUNCTIONAL AND MONITORING NUSPACES W TANK AND INSTALLATION NOTES
<br /> Disapproved: See Remarks
<br /> AND DISPERSER SUMPS SHEET NO
<br /> (� ^ /'� 13 PAYMENT NA ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION WITHIN 30 DAYS
<br /> 1 Remarks c \ / 1 l 1 l .�j / FV M FINAL INSPECTION,
<br /> N.
<br /> V�TP CE: OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY (BY BP).
<br /> MEASUREMENTS OF BRINE LEVELS IN TANKS SHALL BE TAKEN BY BP REPRESENTATIVE DURING THREE SEPARATE VISITS TO STE z 2 24 �
<br /> 1 .'J i? J� . J , 7 , OM /� , O RIOR TO FUELING OPERATIONS, REFER TO TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR REQUIREMENTS. L
<br /> MARCH LANE /
<br /> t
<br /> Approvbl extends only to tht yr ich is shown and described
<br /> i sreon and does not authorize or approve any omission or