Laserfiche WebLink
TANK AND PIPING INSTALLATION SCOPE OF WORK: CLIENT: <br /> bp <br /> GENERAL: TOP OF TANK ELEVATION: ARCO LARGE SITE VARIANT — IF SITE HAS 9 OR MORE MPD S, TWO (2) 2 HP VARIABLE SPEED TURBINES ARE TO BE INSTALLED IN THE PRIMARY <br /> SCOPE OF WORK: UNLESS SPECIFIED OTHERWISE ON THESE DRAWINGS, THE GENERAL CONTRACTOR SHALL FURNISH ALL WORK AND MATERIALS TO CONTRACTOR TO CALCULATE TOP OF TANK ELEVATION. START WITH 18" MINIMUM DEPTH OF VAPOR RECOVERY LINE AT THE FARTHEST DISPENSER REGULAR UNLEADED TANK. THE REGULAR UNLEADED TURBINES SHALL BE SET UP AS "MASTER/SATELLITE/SATELLITE" AND THE CROSS CONNECTION <br /> COMPLETE THE INSTALLATION OF THE SYSTEMS AND EQUIPMENT SHOWN IN THESE DRAWINGS AND AS REQUIRED BY PROJECT DOCUMENTS PROVIDED AND SLOPE 1/4" PER FOOT MAXIMUM TO 1/8" PER FOOT MINIMUM. ADD 12" AT THE TANK. ADD 13" (FOR 3" PIPE) OR 8" (FOR 2") FOR A MANIFOLD BETWEEN TANKS SHALL BE OPENED ALLOWING ALL THREE TURBINES TO SERVE THE ENTIRE SITE. <br /> TO THE CONTRACTOR. CHANGE IN PIPING DIRECTION OTHER THAN 90 OR 45 DEGREES. SET TANKS 6" DEEPER THAN CALCULATED AS PRECAUTION. IN NO EVENT SHALL <br /> THE TANK BE BURIED LESS THAN 4'-0" BELOW FINISHED GRADE OR DEEPER THAN 7'-0" BELOW FINISHED GRADE. SEE MANUFACTURERS NYC VARIANT: MASTER—MASTER TURBINE CONFIGURATION W/ ROTATING STARTS — EQUIPPED AS NOTED ABOVE FOR MASTER—SATELLITE <br /> WHERE THESE DRAWINGS DIFFER FROM LOCAL REGULATIONS, LOCAL REGULATIONS WILL SUPERSEDE THESE DRAWINGS IF THEY ARE MORE STRINGENT. INSTALLATION INSTRUCTIONS FOR MINIMAL TANK BURY WHEN DEADMEN ANCHORING IS NOT PROVIDED. ANY VARIATIONS IN SLOPE FROM 1/4" PER CONFIGURATION EXCEPT WITHOUT SIPHON LINE BETWEEN TANKS: THE UST PRODUCT LEVEL BALANCING IS ACHIEVED BY ROTATING THE STARTING OF <br /> NOTE: FOOT SHALL BE REPORTED TO OWNER'S ENGINEER. INDIVIDUAL IST'S WITH CONTROL LOGIC LINKED TO THE VEEDER ROOT ATG. THE PRODUCT LINES ARE CONNECTED BY A CROSS OVER MANIFOLD <br /> THESE GUIDELINES APPLY ONLY TO UNDERGROUND STORAGE TANKS AND PRODUCT PIPING. REFER TO BALANCE OF SITE SPECIFIC DOCUMENTS/ TANK EXCAVATION: BETWEEN TURBINES. ONE IST, THE MASTER, SHALL HAVE A PLLD LEAK DETECTION DEVICE INSTALLED (PART #VER-848-480-001) AND THE <br /> CONTRACTOR TO EXCAVATE TANK HOLE. CONTRACTOR SHALL ADHERE TO O.S.H.A. STANDARDS ON EXCAVATIONS. CONTRACTOR MAY SELECT ANY OF SATELLITE SHALL HAVE AN FE PETRO NON—VENTED PRECISION CHECK VALVE (PART #65 PSI) INSTALLED. THE BALL VALVE ON MANIFOLD LINE <br /> DRAWINGS FOR SPECIFICATIONS REGARDING CONCRETE/ASPHALT INSTALLATION, ELECTRICAL REQUIREMENTS, AND SANITARY & STORM SEWERS THE RECOMMENDED PRACTICES FOR TANK EXCAVATION AND MUST PROVIDE ALL NECESSARY PROTECTIVE BARRICADES. BETWEEN TURBINES SHALL BE SET IN THE "OPEN" POSITION DURING NORMAL OPERATION. IN CASE OF FAILURE OF AN INDIVIDUAL IST, NO <br /> INSTALLATION. ADJUSTMENT TO THE DISPENSER SIGNAL WIRES WILL BE REQUIRED AS THE IST CONTROLLERS WILL ACCOMMODATE THE IST STARTING VIA THE <br /> SHORING FOR ALL TANK EXCAVATIONS IN ACCORDANCE WITH OSHA 1926 SUBPART P, OSHA STANDARDS — EXCAVATIONS; F <br /> *** WHERE MULTIPLE VERSIONS OF THE SAME SHEET EXIST, INSERT *** SLOPE SIDES OF TANK HOLE (USE OF SLOPING MUST BE RECEIVE PRIOR APPROVAL ON INDIVIDUAL SITE BASIC FROM S; FI OR USENAL RULE VEEDER ROOT ATG LINK. THE PRODUCT IN THE UST WITH THE FAILED IST WILL HAVE THE PRODUCT LEFT IN A STATIC STATE AND NOT AVAILABLE THE SHEET APPROPRIATE FOR THE SPECIFIC STATION LAYOUT. OCTOBER 1, 1989. WHEN ENGINEERED SHORING IS REQUIRED DUE TO SITE CONDITIONS AN ENGINEERED SHORING PLAN UTILIZING FOR DISPENSING UNTIL A REPAIR IS MADE. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. <br /> ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND INTERLOCKING STEEL SHEET PILING SHALL BE PROVIDED AND SHALL INCLUDE SUPPORTING ENGINEERING CALCULATIONS BY A STATE 7) SIPHON LINE INSTALLATION: <br /> EQUIPMENT LOCATIONS CERTIFIED ENGINEER AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR. STANDARD: WHEN SITE SPECIFIC TANK CONFIGURATION SHOWS MULTIPLE TANKS FOR IDENTICAL PRODUCTS, CONTRACTOR TO INSTALL 4" OVER 3" <br /> ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0" OR MORE DOUBLE WALL FIBERGLASS SIPHON LINES AND PIPING CONNECTION VALVES AND FITTINGS BETWEEN TANKS. INSTALL SIPHON PIPING AS LOW AS <br /> BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH THE WORK. IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. POSSIBLE IN SUMP. NOTE LIMITATION ON MAXIMUM SIPHON PIPING SYSTEM HEIGHT ON DETAILS. ADJUST HEIGHT DOWN FOR SMALLER DIAMETER <br /> TANK EXCAVATIONS SHALL BE THE MINIMUM SIZE REQUIRED TO PROVIDE FOR BEDDING AND CLEARANCES INDICATED IN THESE DRAWINGS. TANK TANKS. CONTRACTOR TO INSTALL VEEDER ROOT SIPHON BREAK, IF APPROPRIATE FOR MARKET CONDITIONS. SEE APPROPRIATE SITE SPECIFIC <br /> ALL REQUESTS TO ADD, DELETE, OR SUBSTITUTE MATERIAL AND EQUIPMENT SHOWN ON THESE DRAWINGS MUST BE REVIEWED AND APPROVED BY BURIAL DEPTH FIELD DETERMINED TO PROVIDE FOR 1/4" (1/8" PER FOOT MIN.) PER FOOT FOR STAGE II VAPOR RECOVERY PIPING & 1/8" DRAWINGS FOR INSTALLATION DETAILS. <br /> THE OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER, IN CHARGE OF THE PROJECT. ALL CHANGES MUST BE REVIEWED WITH MINIMUM PER FOOT FOR PRODUCT PIPING SLOPE BACK FROM DISPENSERS TO TANK. NYC VARIANT: SIPHON PIPING IS NOT INSTALLED. SEE TURBINE INSTALLATION NOTE ABOVE. SEE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. <br /> THE MARKETING FUELS MANAGER. TANK STABILITY BUOYANCY CALCULATIONS: ARCO <br /> THE CONTRACTOR IS REQUIRED TO FURNISH AS—BUILT DRAWINGS TO LOCATE TANKS AND PIPING AS INSTALLED AFTER THE COMPLETION OF THE TANK STABILITY SHALL BE RE—CHECKED AGAINST FLOATATION BY INSTALLING CONTRACTOR. SEE BUOYANCY CALCULATIONS ON TANK DETAILING SHEETS. ARCO BRANDED VARIANT: CONTRACTOR TO INSTALL 4" OVER 3" DOUBLE WALL FIBERGLASS SIPHON PIPING. SIPHON BREAK IS NOT INSTALLED. <br /> PROJECT. TANK ANCHORING: INSTALL SIPHON PIPING AS LOW AS POSSIBLE IN SUMP. NOTE LIMITATION ON MAXIMUM SIPHON PIPING SYSTEM HEIGHT ON DETAILS. ADJUST <br /> CONTRACTOR TO INSTALL MANUFACTURER SUPPLIED TANK HOLD DOWN STRAPS & ANCHORS WHEN REQUIRED DUE TO HIGH WATER TABLE, LOCAL HEIGHT DOWN FOR SMALLER DIAMETER TANKS. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. BP WEST COAST PRODUCTS, LLC <br /> (1 ) TANK INSTALLATION: REGULATIONS OR SPECIFIED BY SITE ENGINEER/DESIGNER OR OWNER'S REPRESENTATIVE OR HIS AGENT THE BP PROJECT MANAGER../ WHEN CALIFORNIA VARIANT: SIPHON PIPING TO BE INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481 REQUIREMENTS N0. DATE DESCRIPTION <br /> STANDARD: CONTRACTOR TO INSTALL DOUBLE WALL FIBERGLASS TANKS WITH COMPLETE "VEEDER ROOT—TLS-350 PLUS" TANK AND PIPING <br /> REQUIRED, THE ANCHORING SYSTEM SHALL BE IN COMPLIANCE WITH AUTHORITY HAVING JURISDICTION. ANCHOR & STRAPS TO BE INSTALLED ACCORDING TO <br /> MONITORING AND ALARM SYSTEM. TANKS TO BE SET MIN. 60" BELOW FINISH GRADE. SEE SITE SPECIFIC INSTALLATION DETAILS FOR TANK SIZES AND MANUFACTURER'S INSTRUCTIONS. (H) PRODUCT PIPING INSTALLATION: 0 <br /> LOCATIONS. ** ALTERNATE ANCHORING BY USE OF A CONCRETE ANCHORING SLAB IS PERMITTED. WHEN GROUNDWATER LEVEL IS ANTICIPATED TO BE Q2 <br /> STANDARD: CONTRACTOR TO INSTALL DOUBLE WALL FIBERGLASS PRODUCT PIPING, CONNECTORS, VALVES AND FITTINGS IN TANK AND DISPENSER <br /> NYC VARIANT: INSTALL TOP AND BOTTOM SLAB AND SLAB PIER SUPPORT SYSTEM PER NYC STANDARDS. WITHIN 5 FT. OF GRADE CONTRACTOR SHALL NOTIFY OWNER'S REPRESENTATIVE FOR DIRECTION ON ANCHORING METHOD TO BE USED <br /> (DEADMAN OR ANCHORING SLAB) AND SUCH SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDATION. SUMPS AS SHOWN ON SITE SPECIFIC DETAIL DRAWINGS TO SUPPLY DISPENSERS. PRODUCT PIPING TO BE N.O.V. RED THREAD IIA, 2" INSIDE 3" Q <br /> TANK SIZING GUIDELINES: DIAMETER AS INDICATED ON SITE SPECIFIC FUELING PLAN. ALL PIPING AND FITTINGS SHALL BE UL-971 LISTED IN COMPLIANCE WITH THE JULY 2005 a <br /> SPECIFIC BUSINESS UNIT TANK SIZE REQUIREMENTS ARE RECOMMENDED. TANK SIZING MODELS CAN BE RUN BY CONTACTING FUEL SYSTEM DESIGN ** THIS PROCEDURE IS REQUIRED IN NYC AND CONSIDERED PART OF SCOPE OF WORK WHEN INSTALLING TANKS IN NYC. PERFORMANCE STANDARDS, AND SHALL BE COMPATIBLE WITH ETHANOL, INCLUDING BUT NOT LIMITED TO "FLEX FUEL" (85% ETHANOL 15% GASOLINE). <br /> MANAGER — AMERICAS. NYC VARIANT: IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE FOR THE INSTALLATION OF A 12" CONCRETE ANCHORING SLAB. 4,000 PRODUCTS LINES TO BE EQUIPPED 3 GPH PRESSURE LINE LEAK DETECTORS (PLLD) ON TURBINES AND WITH LIQUID LEAK MONITORING SENSORS Q <br /> LOCATION OF TANKS AND ASSOCIATED EQUIPMENT ON PROPERTY: FINAL FACILITY EQUIPMENT LOCATIONS INCLUDING PLACEMENT AND PSI AT 28 DAYS WITH (2) LAYERS OF 6x6—w5.5xw5.5 ON 2" STEEL CHAIRS TOP & BOTTOM LOCATED IN TURBINE PIPING SUMPS ATTACHED TO TANKS WIRED FOR TURBINE SHUT DOWN. PRODUCT PIPING IN TURBINE SUMPS, PRODUCT PIPING 0 <br /> ORIENTATION OF TANKS, EMERGENCY SHUTOFF SWITCHES, OVERFILL ALARMS (IF PRESENT) TO BE APPROVED BY BP DISTRIBUTION PRIOR CROSS CONNECTION MANIFOLDS BETWEEN SUMPS AND SIPHON PIPING PENETRATIONS ARE TO ENTER THE SAME SIDE OF THE SUMP IF POSSIBLE. IF <br /> TO SUBMITTAL FOR PERMITS TO ENSURE CLEAR AND SAFE ACCESS TO THE UNDERGROUND TANKS FOR UNLOADING OPERATIONS. THE FILTER FABRIC: IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE FOR THE INSTALLATION OF FILTER FABRIC (DUPONT TYPAR OR MIRAFI PRODUCT PENETRATION ENTERS ON BOTH SIDES OF SUMP DUE TO FIELD CONDITIONS, THEN DUAL SENSORS AT TURBINE SUMP MAY BE REQUIRED <br /> GENERAL CONTRACTOR IS RESPONSIBLE FOR CONFIRMING APPROVED TANK AND EQUIPMENT LOCATIONS HAS BEEN DOCUMENTED W/ BP 50OX ) WHICH IS REQUIRE FOR WET HOLE INSTALLATIONS OR UNSUITABLE SOILS. (NOTE: A WET HOLE/ UNSUITABLE AREA REQUIRING TO BE INSTALLED BY LOCAL REGULATIONS. IF THE BP PROJECT MANAGER DETERMINES THAT THE ALL THE PIPING ENTRIES NOTED ABOVE COULD <br /> DISTRIBUTION, THE SITE ENGINEER AND/OR OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER PRIOR TO THE FILTER FABRIC IS ANY TANK EXCAVATION IN WHICH THE AREA IS SUBJECT TO: TIDAL INFLUENCES, OR AREAS SUBJECT TO FREQUENTLY HAVE BEEN MADE TO THE SAME SIDE OF THE SUMP, THEN ANY COSTS ASSOCIATED WITH EXTRA SENSORS SHALL BE BORNE BY THE INSTALLING <br /> COMMENCEMENT OF WORK. CHANGING GROUND WATER LEVELS, OR WATER CONDITIONS WITH SILTY SOIL, OR MUCK, BOG, PEAT, SWAMP, LANDFILL TYPE AREAS OR <br /> TANKS: ANY OTHER SITUATION WHERE THE SOIL IS INHERENTLY UNSTABLE, OR SOILS WITH LESS THAN 250 LBS./SQ. FT. COHESION, OR WITH CONTRACTOR. PIPING TO BE INSTALLED WITH A SLOPE OF 1/8" PER FOOT MINIMUM TO TANKS UNLESS APPROVED BY OWNER. CONTRACTOR TO <br /> SHALL BE UNDERWRITERS LABORATORY APPROVED LISTED FOR THE UNDERGROUND STORAGE OF ALL FLAMMABLE AND COMBUSTIBLE MOTOR FUELS ULTIMATE BEARING CAPACITY OF LESS THAN 500 LBS. SQ. FT. OR AT THE REQUEST OF THE TANK OWNER. ALL WET HOLE BALLAST INSTALL TRACER TAPE WITH PRODUCT PIPING PER TRENCHING DETAILS. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH DOUBLE WALL FRP io <br /> AS CALLED FOR ON THE SITE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND SHALL BE DOUBLE WALL TANKS OF INSTALLS (AS DESCRIBED IN SECTION BELOW) SHALL USE FILTER FABRIC. ENTRY FITTINGS. TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. SEE <br /> FIBERGLASS REINFORCED PLASTIC (FRP). INSTALLATION OF TANKS AND PIPING SHALL BE IN ACCORDANCE WITH U.L. LISTED MANUFACTURER'S SITE SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. >> <br /> INSTRUCTIONS. INSTALLATION SHALL CONFORM TO NFPA-30/30A AND ALL APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. TANKS SHALL FILTER FABRIC SHALL EXTEND 1 FOOT ABOVE MAX HIGH WATER TABLE AND SEAMS SHALL BE OVERLAPPED BY 1 FOOT. MATERIAL SHALL Q <br /> ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE STATE IN WHICH THE TANKS ARE TO BE INSTALLED AND BY THE TANK BE PINNED OR OTHERWISE SECURED ALLOW BACKFILL WITHOUT DISTURBANCE. USE OF PLASTIC, OR ANY OTHER MATERIAL THAT MAY TEAR, ***NOTE*** "FIBERCAST SYSTEMS" PIPING TO BE INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL AND SHALL ONLY BE INSTALLED BY <br /> MANUFACTURER. OR DEGRADE OVERTIME IS PROHIBITED. QUALIFIED INSTALLERS CERTIFIED BY THE MANUFACTURER. <br /> THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. ALL CONTINUOUS MONITORING CALIFORNIA VARIANT: IN ADDITION TO THE ABOVE, PIPING TO BE INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481 <br /> DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. WET HOLE BALLAST METHOD: REQUIREMENTS <br /> ALL MATERIALS USED IN THE INSTALLATION SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY WATER IS THE SUITABLE MEDIUM FOR BALLAST DURING WET HOLE TANK INSTALLATIONS. A PROPERLY INSTALLED 12 FOOT HIGH TEMPORARY VENT PIPE D <br /> RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORITIES. MUST BE INSTALLED BY THE CONTRACTOR. IF WATER IS USED TO BALLAST TANKS, THE WATER IS TO BE COMPLETELY PUMPED OUT & MOPPED DRY IN (9) VENT PIPING INSTALLATION: <br /> METHANOL COMPATIBILITY: FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS, ALL READILY ACCESSIBLE COMPONENTS SHALL BE METHANOL ORDER TO PROTECT FUEL INTEGRITY. CONTRACTOR IS REQUIRED TO COORDINATE BALLASTING OPERATIONS WITH OWNER'S REPRESENTATIVE OR HIS AGENT, STANDARD: CONTRACTOR TO INSTALL 2" INDIVIDUAL SINGLE WALL FIBERGLASS VENT PIPING, CONNECTORS, VALVES AND FITTINGS ON TANKS AS 1 <br /> THE BP PROJECT MANAGER. IT IS THE INSTALLING CONTRACTORS RESPONSIBILITY TO DETERMINE THE JURISDICTIONAL REQUIREMENTS AND ACCEPTANCE SEAL: <br /> COMPATIBLE FOR THE IMMEDIATE INTENDED SERVICE. FOR BALLASTING THE TANKS AND TO PROVIDE FOR PROPER DISPOSAL OF THE BALLASTING MEDIUM UNDER THE REGULATIONS OF THE GOVERNING INDICATED ON SITE SPECIFIC FUELING PLAN AND ACCOMPANYING DETAILS. CONTRACTOR TO PROVIDE AT LEAST 4 FEET OF PIPING RUN BEFORE A <br /> BIO—DIESEL COMPATIBILITY: CURRENTLY AT THIS TIME, NO TANKS ARE LISTED FOR BIO—DIESEL SERVICE APPLICATIONS. AUTHORITY. CHANGE OF DIRECTION OF 30 DEGREES OR MORE IN ORDER TO PROVIDE MECHANICAL FLEXIBILITY PER CODE REQUIREMENTS. CONTRACTOR TO <br /> INSTALL TRACER TAPE WITH VENT PIPING PER TRENCHING DETAILS. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH SINGLE WALL ENTRY <br /> INITIAL TANK TESTING: FITTINGS. VENT PIPING SHALL BE DESIGNED AND INSTALLED FOR SLOPE 1/4" PER FOOT MINIMUM BACK TO TANKS. FOR LONG PIPING RUNS 1/8" <br /> NEW TANKS SHALL BE INSPECTED UPON ARRIVAL AT SITE, AFTER UNLOADING FROM THE TRUCK, FOR VISUAL DAMAGE PRIOR TO INSTALLATION. BACK FILL: PERFOOT IS ACCEPTABLE. SS�O <br /> OF DAMAGE. MINIMUM 1/8" AND MAXIMUM 3/4" SIZE. FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER AND SOAP TESTS ON ACCESSORIES AND FITTINGS CAN BE PERFORMED AFTER THE TANK IS IN CONTRACTOR TO INSTALL ABOVE GROUND RISERS AND MOUNTING RACK AS DETAILED ON THESE PLANS. TERMINATION POINT OF TANK VENTS TO BE '� <br /> FOR LIQUID FILLED ANNULAR SPACE TANKS — AIR OWNERS FIELD REPRESENTATIVE. <br /> / A MINIMUM OF 12 ABOVE GRADE AND NOT WITHIN 5 FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. VENT RISERS <br /> THE EXCAVATION BEFORE OR AFTER BACKFILLING. NO MORE THAN 5% (BY WEIGHT) MAY PASS THE #8 SIEVE FOR BACK FILLING NONMETALLIC TANKS WITH A 96% TO 98% FREE FALL COMPACTION. DRY SHALL BE INSTALLED IN ACCORDANCE WITH NFPA-30, INTERNATIONAL AND UNIFORM FIRE CODE REQUIREMENTS AND CARB EVR REQUIREMENTS. NO. 36475 <br /> PEA GRAVEL DENSITY MINIMUM OF 95 POUNDS PER CUBIC FOOT IS REQUIRED. SUPPLY QUARRY CERTIFICATION MEETING ASTM C-33, PARAGRAPH 9.1 * XP. 6-30-22 <br /> CONTRACTOR SHALL COMPLETE ALL TESTING ACCORDING TO MANUFACTURER'S INSTRUCTIONS FOR THE TANKS. CONTRACTOR SHALL COMPLETE ALL REQUIREMENTS. CONTRACTOR TESTING OF VENT LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. SEE SITE y CIVIL <br /> WARRANTY VALIDATION TESTING AND PROVIDE DOCUMENTATION TO OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER. BACK FILLING OF TANK EXCAVATIONS SHALL BE PROVIDED IN LIFTS AS PER TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS. SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. SEE FIBERGLASS PIPING MANUFACTURER SPECIFICATION BELOW. TF OF CAL�F�� <br /> HYDROSTATICALLY MONITORED DOUBLE WALL TANKS SHALL BE TESTED ACCORDING TO MANUFACTURER'S INSTRUCTIONS BY: PRODUCT, VENT, AND VAPOR PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A 6" BED OF COMPACTED PEA GRAVEL. BLOCKS, PLANKS, VENT PIPING SPECIFICATION: <br /> - INSPECT AND ADJUST RESERVOIR LEVEL OF THE MONITORING FLUID (TO COVER THE RIBE INSIDE THE RESERVOIR. OR OTHER DEBRIS SHALL NOT BE USED TO SUPPORT PIPING IN FINAL INSTALLATION. <br /> - REMOVE ENOUGH TANK FITTING PLUGS TO SEE INSIDE THE PRIMARY TANK. VISUALLY INSPECT THE TANK INTERIOR FOR COLORED MONITORING NOTE: UNDER NO CIRCUMSTANCES SHALL DIRT, PAVING MATERIALS, WOOD, OR OTHER CONSTRUCTION DEBRIS BE ALLOWED TO REMAIN IN TANK AND FIBERCAST SYSTEMS: RED THREAD II PIPE AND FITTINGS (USED FOR SINGLE WALL). WHERE DOUBLE WALL SYSTEMS ARE REQUIRED FOR ALL VENT <br /> FLUID TRACES. PIPE EXCAVATIONS. AND VAPOR PIPING, USE SIZE OVER SIZE RED THREAD II PIPING AND FITTINGS. USE ONLY FIBERCAST SYSTEMS ALCOHOL COMPATIBLE ADHESIVES. <br /> - CONNECT TANK TEST MANIFOLD AND PRESSURIZE THE PRIMARY TANK TO 5 PSIG MAX. (3 PSIG MAX. FOR 12' TANKS). MONITOR THE ALL PIPING AND FITTINGS SHALL BE UL-971 LISTED IN COMPLIANCE WITH THE JULY 2005 PERFORMANCE STANDARDS. <br /> PRESSURE FOR 30 MINUTES FOR ANY LOSS IN PRESSURE THAT MAY INDICATE A LEAK. (2) ANNULAR SPACE HYDROSTATIC MONITOR AND RISER INSTALLATION: z <br /> Lu <br /> — DO NOT PRESSURIZE THE ANNULAR SPACE. DOING SO MAY DAMAGE THE PRIMARY TANK OR CAUSE TANK FAILURE. STANDARD: CONTRACTOR TO INSTALL 4" FIBERGLASS RISER AND VEEDER ROOT HYDROSTATIC SENSOR AT TANK ANNULAR SPACE LOCATION NOTED PIPING TO BE INSTALLED PER MANUFACTURER'S LISTED INSTRUCTIONS AND SHALL ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE <br /> co <br /> — WHILE UNDER PRESSURE, COVER FITTINGS AND MANWAY(S) WITH SOAP SOLUTION AND INSPECT. ON THE PLANS PER MANUFACTURERS INSTRUCTIONS. MANUFACTURER. PROVIDE AT LEAST 4' OF STRAIGHT PIPING RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES AND INSTALL CD coMco <br /> — AFTER COMPLETING AIR TEST, RELEASE PRESSURE; REMOVE ALL GAUGES, VALVES, AND HOSE ASSEMBLIES; REPLACE AND TIGHTEN FITTING FLEXIBLE CONNECTORS AT THE VENT AND VAPOR CONNECTION AT THE TANK SUMPS, AND DISPENSER SUMPS. Q <br /> PLUGS; AND REPLACE THE PLASTIC VENT PLUG IN THE OPEN FITTINGS. (3) TANK SUMP INSTALLATION: z 2 Lu m o <br /> ***NOTE*** HYDROSTATIC FLUID RESERVOIR LEVEL MUST BE RECHECKED TO VERIFY TANK INTEGRITY PRIOR TO INTRODUCING BALLAST INTO TANKS. STANDARD: CONTRACTOR TO INSTALL 42" OR 48" DIAMETER TURBINE SIDE FIBERGLASS POLYSIDED SUMPS ON TANKS PER MANUFACTURER'S NYC VARIANT: SAME AS ABOVE EXCEPT: VENT CONNECTIONS ARE ROUTED TO A SEPARATE UNOBSTRUCTED EXTRACTOR FITTING LOCATED IN THE z TD cocco <br /> INSTRUCTIONS. NOTE THAT THE ORIENTATION OF THE TANK SUMPS MUST BE CORRECT IN ORDER TO FACILITATE CORRECT PIPING INSTALLATION INTO TURBINE SIDE. VENT TERMINATION TO BE A MINIMUM OF 15' ABOVE GRADE. <br /> THE SUMPSm Z <br /> . SEE ACCOMPANYING DETAILS IN PLAN SET AND NOTE SIZES OF SUMPS PER PROJECT DEMOGRAPHICS. _ U o Q <br /> FIELD REPAIR OF TANKS: IT IS ALLOWABLE TO FIELD REPAIR DAMAGED TANKS AFTER APPROVAL BY BP FILED ENGINEER. ALL TANKS DAMAGED IN � a <br /> JURISDICTIONAL VARIANT: INSTALL DOUBLE WALL SIZE OVER SIZE FIBERGLASS PIPING WHEN REQUIRED BY AUTHORITY HAVING JURISDICTION. o cr cc 00 x <br /> TRANSPORT OR OFF LOADING OPERATIONS SHALL BE FIELD REPAIRED BY A TANK MANUFACTURER'S CERTIFIED FIELD SERVICE REPRESENTATIVE. TANK cc Q <br /> NYC VARIANT: 42" DIAMETER TURBINE SUMPS ARE INSTALLED. °C W v) w <br /> MANUFACTURER SHALL RE—CERTIFY REPAIRED TANKS FOR USE. ALL FIELD SERVICE WORK SHALL BE DOCUMENTED. COPIES OF ANY AND ALL FIELD CALIFORNIA VARIANT: VENT PIPING TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481 < LJJ z z <br /> SERVICE DOCUMENTATION SHALL BE PLACED IN THE PROJECT FILE AND INTO OWNERS OPERATING FILE. LONG ISLAND/NY VARIANT: ON TANKS INSTALLED IN LONG ISLAND, FILL SUMPS ARE REQUIRED. SEE ENCLOSED DRAWINGS FOR DETAILS REQUIREMENTS II w O z o0 <br /> 'mZ 0 Z) co <br /> TANK MEASUREMENTS: ARCO BRANDED VARIANT. 48" DIAMETER TURBINE SUMPS ARE INSTALLED. 10 STAGE II VAPOR RECOVERY PIPING INSTALLATION: ( I) C� z U " 0 <br /> THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE FOLLOWING TANK MEASUREMENT ACTIVITIES: ( ) z Z � p z a <br /> 1. VERIFY THE EXTERNAL SIZE OF THE TANK TO MATCH WITH MANUFACTURER SUPPLIED SHOP MEASUREMENTS. CALIFORNIA VARIANT: 42" DIAMETER FILL SUMPS TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS HYDROSTATIC MONITORING DEVICE PER STANDARD: CONTRACTOR TO INSTALL 3" SINGLE WALL FIBERGLASS STAGE II VAPOR RECOVERY HEADER, CONNECTORS, VALVES AND FITTINGS TO THE g LJJ w < <br /> TRANSFER THE SIZE, SERIAL NUMBER, AND PRODUCT INSTALLED, AND POSITION OF TANK TO THE AS—BUILT PLAN. AB-2481 REQUIREMENTS. LOWEST OCTANE GRADE AS INDICATED ON SITE SPECIFIC FUELING PLAN AND ACCOMPANYING DETAILS. NOTE THAT THE 1ST CONNECTION FROM STAGE (n z 'n Q C° <br /> 2. TRANSFER TANK DIMENSIONAL AND PRODUCT INFORMATION TO THE DATA SHEET IN THE TANK GAUGE CONSOLE. / 0 o U <br /> 3. PROVIDE THE TOP OF TANK ELEVATION READING AT BOTH ENDS OF EACH TANK. (4) TANK LEVEL GAUGE ! OVERFLOW PROTECTION: II VAPOR RECOVERY HEADER TO LOWEST OCTANE TANK SHALL BE 3". ALL OTHER CONNECTIONS TO ADDITIONAL TANKS SHALL BE MADE WITH 2". °6 w w w <br /> CONTRACTOR TO INSTALL 3 TO 2 REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. MAXIMUM (2) DISPENSERS PER 2 BRANCH. N z <br /> TANK DEFLECTION MEASUREMENT PROCEDURE: STANDARD: CONTRACTOR TO INSTALL VEEDER ROOT MAGNOSTRICTIVE PROBE LEVEL GAUGE AT LOCATION NOTED ON PLANS PER MANUFACTURER'S CONTRACTOR TO PROVIDE AT LEAST 4 FEET OF STRAIGHT PIPING RUN BEFORE A CHANGE OF DIRECTION OF 30 DEGREES OR MORE IN ORDER TO Q z O <br /> DEFLECTION MEASUREMENT BEFORE AND AFTER TANK INSTALLATION SHALL BE ACCORDING TO MANUFACTURER'S REQUIREMENTS AND SHALL BE INSTALLATION INSTRUCTIONS. PROVIDE MECHANICAL FLEXIBILITY PER CODE REQUIREMENTS. CONTRACTOR TO INSTALL TRACER TAPE WITH VAPOR PIPING PER TRENCHING DETAILS. z m <br /> WITHIN MANUFACTURER'S TOLERANCES. ALL INFORMATION SHALL BE COMPLETED AS PER THE MANUFACTURER'S WARRANTY DOCUMENTATION. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH DOUBLE WALL ENTRY FITTINGS. STAGE II VAPOR RECOVERY PIPING SHALL BE DESIGNED AND z <br /> OVERFLOW PROTECTION: UST OVERFLOW COMPLIANCE IS ACHIEVED BY USE OF OVERFLOW PREVENTION DROP TUBE FLAPPER VALVE SET AT 95% AND INSTALLED FOR 1/4" PER FOOT MINIMUM SLOPE BACK TO TANKS. AT LARGE SITE LAYOUTS, 1/8" PER FOOT MINIMUM IS ACCEPTABLE IF IT AVOIDS <br /> IS IN ACCORDANCE WITH FEDERAL AND STATE GUIDELINES FOR UST OVERFILL REQUIREMENTS. USING A KNOCK OUT SUMP (VAPOR POT) OR HAVING EXCESSIVE TANK DEPTH. CONSULT OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP 0- <br /> AN <br /> AN OVERFILL ALARM AND ACKNOWLEDGE SWITCH TIED INTO THE VEEDER ROOT AUTOMATIC TANK GAUGE SYSTEM. THE MONITORING SYSTEM PROVIDES <br /> PROJECT MANAGER, WHERE DISCREPANCIES OCCUR. DEVELOPMENT INFORMATION: <br /> AN AUDIBLE AND VISUAL ALARM WHEN THE TANK(S) ARE FILLED TO THE 90% LEVEL. CONTRACTOR TESTING OF STAGE II VAPOR LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. <br /> (5) FILL AND STAGE I VAPOR RECOVERY INSTALLATION: SEE SITE SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. SEE FIBERGLASS PIPING MANUFACTURER SPECIFICATION BELOW. <br /> STANDARD: CONTRACTOR TO INSTALL 4" GALVANIZED FILL AND STAGE I VAPOR RECOVERY RISERS. CONTRACTOR TO INSTALL DROP TUBE ASSEMBLY. STAGE II PIPING SPECIFICATION: <br /> DOUBLE WALL „ „ WITH OVERFILL PREVENTION DROP TUBE. CONTRACTOR TO INSTALL VENT AND STAGE II FLEX CONNECTORS AND FRP ADAPTERS. LOCATE AND CUT <br /> FRP TANK I.D.= A PENETRATIONS INTO SUMPS FOR THE ROUTING OF VENT AND STAGE II VAPOR PIPING INTO TURBINE SUMPS AND MAKE CONNECTIONS TO VENT AND FIBERCAST SYSTEMS: RED THREAD II PIPE AND FITTINGS (USED FOR SINGLE WALL). WHERE DOUBLE WALL SYSTEMS ARE REQUIRED FOR ALL VENT <br /> DOUBLE WALL VAPOR PIPING FIBERGLASS PIPING. CONTRACTOR TO INSTALL DOUBLE SIDED PENETRATION ENTRY BOOTS FOR ALL ENTRIES INTO SUMPS. CONTRACTOR AND VAPOR PIPING, USE SIZE OVER SIZE RED THREAD II PIPING AND FITTINGS. USE ONLY FIBERCAST SYSTEMS ALCOHOL COMPATIBLE ADHESIVES. <br /> FRP TANK I.D.="B" TO INSTALL STATIC GROUNDING SYSTEM AT ALL FILL AND VAPOR RISERS PER INSTALLATION DETAILS SHOWN ON SHEET G.0.7. ALL PIPING AND FITTINGS SHALL BE UL-971 LISTED IN COMPLIANCE WITH THE JULY 2005 PERFORMANCE STANDARDS. <br /> SITE ADDRESS: <br /> CONTRACTOR TO INSTALL CARB APPROVED STAGE I MANHOLES WITH 5 GALLON SPILL COLLECTION BUCKETS. INSTALL PRODUCT AND FILL ADAPTERS AND PIPING TO BE INSTALLED PER MANUFACTURER'S LISTED INSTRUCTIONS AND SHALL ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE <br /> CAPS. SEE ACCOMPANYING DETAILS IN SITE SPECIFIC PLAN SET FOR MANUFACTURER AND INSTALLATION REQUIREMENTS. MANUFACTURER. PROVIDE AT LEAST 4' OF STRAIGHT PIPING RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES AND INSTALL ADDRESS <br /> 43 WEST MARCH LANE <br /> NYC VARIANT: CONTRACTOR TO PROVIDE THE INSTALLATIONS OF A SEPARATE UNOBSTRUCTED VENT CONNECTION AT EACH TANK AT THE TURBINE SIDE FLEXIBLE CONNECTORS AT THE VENT AND VAPOR CONNECTION AT THE TANK SUMPS, AND DISPENSER SUMPS. 12���CA 95215 <br /> OF THE TANK AS PER PLANS AND PER NYC CODE REQUIREMENTS. A 15 GALLON PRODUCT SPILL COLLECTION BUCKET IS REQUIRED BY NYC FIRE JURISDICTIONAL VARIANT: INSTALL DOUBLE WALL SIZE OVER SIZE FIBERGLASS PIPING WHEN REQUIRED BY AUTHORITY HAVING JURISDICTION. <br /> CODE. FILL SPILL BUCKETS MUST HAVE A NYC CERTIFICATE OF APPROVAL FROM FIRE DEPARTMENT. <br /> BEFORE BACK FILL AFTER BACK FILL <br /> TANK INSPECTION AND INSTALLATION - DEFLECTION MEASUREMENT (6) TURBINE INSTALLATION: CALIFORNIA VARIANT: STAGE II VAPOR PIPING TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481 <br /> DIPSTICK PREPARATION <br /> STANDARD: CONTRACTOR TO INSTALL FE PETRO IST 2 HP VARIABLE SPEED TURBINES AND PIPING CONNECTION VALVES AND FITTINGS IN TANK SUMPS REQUIREMENTS. ALL CONNECTIONS TO THE TANKS SHALL BE MADE WITH 3". DESIGNED BY: <br /> DRIVE A SMALL HEADED, NON—SPARKING (E.G. BRASS) NAIL HALFWAY INTO A WOODEN DIPSTICK, 1 INCH ABOVE ITS BASE. AS SHOWN ON SITE SPECIFIC DETAIL DRAWINGS. ALL PRODUCT LINES TO TURBINES TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK DETECTION. THEREARE 4 <br /> LEAK DETECTORS ARE TO BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF ( ) FOUR STAGE II EVR WITH ISD DESIGN CHOICES THAT MAY BE INCORPORATED INTO THE UST SYSTEMS IN CALIFORNIA. CHECKED BY: <br /> FIRST DIAMETER READING (PRIOR TO BACK FILL) PUNCH LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER. ALL TURBINES ARE EQUIPPED WITH STANDARD "R" CHECK VALVE AS A STANDARD FROM 1. VEEDER ROOT CARBON CANISTER VAPOR POLISHER WITH VST BALANCE HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS. DRAWN BY: ER <br /> 2. MEASURE AND RECORD THE DISTANCE FROM THE TANK BOTTOM TO THE TOP OF THE FITTING. <br /> 1. PLACE THE DIPSTICK INTO A SERVICE FITTING. „ 3. VST ECS VAPOR PROCESSOR WITH VST BALANCE HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS.2. HEALY CLEAN AIR SEPARATOR WITH HEALY VACUUM ASSIST HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS. <br /> FACTORY. SET TURBINE INTAKES AT 5 FROM BOTTOM OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR TO INSTALL DATE: PROJECT NO: <br /> 3. PULL THE DIPSTICK UP UNTIL THE EXPOSED NAIL CATCHES ON THE INSIDE TOP OF TANK. 1" RIGID STEEL CONDUITS FOR SUBMERSIBLE PUMP POWER. (ONE FOR EACH TURBINE). CONTRACTOR IS TO LABEL TURBINES AND CONTROLLERS AS TO 4. VST BALANCE HANGING HARDWARE WITH FRANKLIN FUELING/HEALY CLEAN AIR SEPARATOR AND VEEDER ROOT ISD COMPONENTS. 04/14/2021 7161 <br /> 4. MEASURE THE DISTANCE FROM THE TANK TOP (INSIDE) TO THE TOP OF THE FITTING. SUBTRACT 1 INCH FROM THIS MEASUREMENT AND WHICH PRODUCT THEY SERVE. GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR LOSE POWER. IST PUMP CONTROLS ARE <br /> RECORD THE DISTANCE. TIED TO VEEDER ROOT CONTROL PANEL. SEE APPROPRIATE TURBINE CONFIGURATION AND PROGRAMMING SHEETS. SEE GENERAL SHEETS G.0.6 SERIES DRAWINGS FOR DESIGN INTENT DETAILS ON THE ABOVE SYSTEMS. DRAWING TITLE: <br /> 5. SUBTRACT THE SECOND DISTANCE FROM THE FIRST AND RECORD THIS VALUE AS READING "A" ON THE INSTALLATION CHECKLIST. SINGLE MASTER TURBINE CONFIGURATIONS — EQUIPPED AS NOTED ABOVE. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. TANK AND PIPING <br /> SECOND DIAMETER READING (AFTER BACKFILL) NYC VARIANT: STAGE II VAPOR RECOVERY IS CURRENTLY NOT REQUIRED IN NYC & NEW JERSEY MARKET SCOPE OF WORK <br /> 1. PLACE THE DIPSTICK INTO A SERVICE FITTING WITH A STANDPIPE INSTALLED TO SUBGRADE. MASTER—SATELLITE TURBINE CONFIGURATIONS — EQUIPPED AS NOTED ABOVE EXCEPT: ONLY THE MASTER TURBINE SHALL HAVE THE PLLD LEAK AND GENERAL NOTES <br /> 2. MEASURE AND RECORD THE DISTANCE FROM THE TANK BOTTOM TO THE TOP OF THE STANDPIPE. DETECTOR INSTALLED. CONTRACTOR TO REMOVE THE STANDARD "R" CHECK VALVE OUT OF THE SATELLITE TURBINE. THE BALL VALVE ON MANIFOLD LINE (FRP 1 OF 3) <br /> 3. PULL THE DIPSTICK UP UNTIL THE EXPOSED NAIL CATCHES ON THE INSIDE TOP OF TANK. BETWEEN TURBINES SHALL BE SET IN THE "OPEN" POSITION AND A SINGLE PLLD (PART #848-480-001) IS TO BE INSTALLED ON THE MASTER IST NOTE: CONTACT BP FUEL SYSTEM DESIGN MANAGER FOR CURRENT STATES NO LONGER REQUIRING STAGE II VAPOR RECOVERY <br /> 4. MEASURE THE DISTANCE FROM THE TANK TOP (INSIDE) TO THE TOP OF THE STANDPIPE. SUBTRACT 1 INCH FROM THIS MEASUREMENT AND WITH AN FE. PETRO NON—VENTED PRECISION CHECK VALVE (PART #65 PSI) INSTALLED ON THE SATELLITE IST PREVENTING BACKFILLING OF USTs. SEE (10A DECOMMISSIONING STAGE II VAPOR RECOVERY: SHEET NO: <br /> RECORD THE DISTANCE. APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. ) <br /> 5. SUBTRACT THE SECOND DISTANCE FROM THE FIRST AND RECORD THIS VALUE AS READING "B" ON THE INSTALLATION CHECKLIST. STANDARD: FOR PROJECTS INVOLVING THE DECOMMISSIONING OF STAGE II VAPOR RECOVERY SYSTEMS, G.C. IS TO VERIFY WITH THE AUTHORITY <br /> CALCULATION AND COMPARISON MASTER—MASTER TURBINE CONFIGURATIONS — EQUIPPED AS NOTED ABOVE EXCEPT: THE BALL VALVE ON MANIFOLD LINE BETWEEN TURBINES SHALL BE HAVING JURISDICTION THAT STAGE II IS NO LONGER REQUIRED AT A SPECIFIC FACILITY BEFORE INITIATING THE DECOMMISSIONING WORK AND WHICH <br /> 1. SUBTRACT READING B FROM READING "A". SET IN THE "CLOSED" POSITION DURING NORMAL OPERATION. SEPARATE LINES & (2) PLLDs (PART #VER 848 480 001) SHALL BE INSTALLED. IN DECOMMISSIONING PROCEDURES ARE REQUIRED TO BE IMPLEMENTED. SEE SHEET G.0.6.15. FOR GENERAL REQUIREMENTS AND PROCEDURES. <br /> 2. COMPARE THIS VALVE TO THE TABLE OF MAXIMUM ALLOWABLE DEFLECTIONS SHOWN ON THE INSTALLATION CHECKLIST . CASE OF FAILURE OF AN INDIVIDUAL IST, THE PRODUCT CROSS—OVER LINE CAN BE PLACED INTO OPERATION BY OPENING THE CROSS CONNECTING CONSULT OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER, WHERE DISCREPANCIES OCCUR BETWEEN THE CONTRACT <br /> 3. VERTICAL DEFLECTION IN EXCESS OF THESE VALUES INDICATES IMPROPER INSTALLATION AND VOIDS THE TANK WARRANTY. VALVE. THE FAILED IST MUST HAVE ITS PLLD DISABLED & DISPENSER SIGNAL WIRES NEED TO BE MODIFIED FOR THIS TEMPORARY SET—UP. SEE DOCUMENTS AND THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. G ,0,2 , 1 <br /> APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. <br /> MAXIMUM DEFLECTION FOR 8'-0" TANKS = 1-1/4" <br /> MAXIMUM DEFLECTION FOR 10'-0" TANKS = 1-1/2" <br />